|
1. The Subject Of The Order - Described In Annexes No. 5 And 6 To The Swz - Includes, Among Others: 1) Construction Of A New Fountain Basin, 2) Construction Of An Installation Chamber, 3) Reconstruction Of The Sculpture Based On An Inventory Of The Existing Condition And A Conservation Project Prepared By Mariusz Lewicki, Ma, 4) Construction Of A New Sprinkler Installation, 5) Construction Of Slot-Overflow Drainage To Prevent Water From Overflowing Outside The Basin Fountains,6) New Lighting For The Facility.2. The Contractor Will Be Obliged - At His Own Expense And Within His Own Scope - Also To, Among Others: To: 1) Provide Technical Supervision Over The Task Being Carried Out, 2) Provide Full Geodetic And Cartographic Cartographic Services (Geodetic And Cartographic Works Should Be Carried Out In Accordance With The Technical Conditions Issued By The City Surveyors Office. The Contractor Will Be Obliged To Conduct Geodetic Service Of The Task And Prepare As-Built Geodetic Documentation In Accordance With The Applicable Technical Conditions For Conducting Geodetic Works - Regarding The Establishment Of The Gesut And Bdot 500 Database In The City Of Szczecin In 2016 And Maintaining Part Of The Digital System Of The State Geodetic And Cartographic Resource In The Sip Geo-Info System 7),3) Traffic Organization For The Duration Of Construction Along With The Development Of Documentation (Including A Traffic Organization Project) And The Necessary Arrangements And Occupation Of The Road Lane, Including Charged Fees, Markings And Restoration Of The Original Marking, If Necessary,4) Securing Existing Networks And Facilities In The Area Of Works Being Carried Out And Cooperation With Network Owners, Including Including: Enea Operator Sp. Z O. O., Netia S.A., Upc Polska Sp. Z O. O., Gaz System S.A., Orange Polska S.A., Multimedia Polska S.A., Zwik Sp. Z O. O., Enea Ozdrowienie Sp. Z O. O., Polska Spółka Gazownictwa Sp. Z O. O., Zditm Sp. Z O. O. - If Necessary, 5) Proper Fencing And Security Of The Construction Site, 6) Maintaining Order At The Exit From The Construction Site To Public Roads And Within The Area Of The Works Being Carried Out, 7) Organizing The Construction Site And Social Facilities Along With Restoring The Area To Its Original Condition, 8) Securing Own Property On The Work Site, Repairing Damage Caused During The Work, 9) Supplying Water, Electricity And Communication Means, 10) Carrying Out The Work In A Way That Does Not Cause Any Inconvenience To People Visiting The Park And Ensuring Communication Routes And Safe Passage,11) Tidying Up The Area After Completion Of The Works, Including Removing Damage Caused During The Work,12) Ensuring Safe Conditions For The Implementation Of The Works, Specified In Fire Protection Regulations. And Occupational Health And Safety And Environmental Protection Regulations, Including Employee Training,13) Keeping A Construction Log,14) Developing A Safety And Health Protection Plan,15) Marking The Con
|