|
1. The Subject Of The Order Is The Execution Of The Task Titled: Construction Of A Water Supply Network In The City. Dębnik-Tolniki Małe-Kępa Tolnicka, An Investment Implemented In Rural Areas In The Commune. Reszel (Where There Were State Farms). The Subject Of The Investment Is The Construction Of A Water Supply Network In The City. Dębnik-Tolniki Małe-Kępa Tolnicka Will Be Made Of Pvc Pipes Dn 110 With A Length Of L = 5847 M Connected With Gaskets And Reinforcement. All Cast Iron Flange Fittings With A Planned Pressure Of 1.0 Mpa. The Route Of Water Supply Lines And The Location Of Fittings Will Be Permanently Marked. On The Tolniki Male-Trksy Water Supply Network Route, A Reduction Chamber Will Be Made Of Concrete Rings With A Diameter Of 1.45 Mm And A Height Of 2.06 M With The Installation Of A Pressure Regulator. The Chamber Will Be Placed On The Pvc Water Supply Route, 400 M From The Building, Where The Planned Working Pressure Will Be P=4.5+5.0 Bar. The Water Supply Network In The Provincial Road Will Be Constructed Using The Trenchless Method, I.E. Controlled Drilling In A Perc Dn160x9.5 Mm Casing Pipe With A Length Of L = 29.40 Without Disturbing The Road Surface. The Water Supply Network Is Equipped With Cast Iron Flanged Fittings Connected With Galvanized Screws And Rubber Gaskets. Construction Of A Water Supply Network In The City. Dębnik-Tolniki Małe-Kępa Tolnicka Will Be Carried Out On Plot Numbers: 1) Dębnik District 0004: 142, 163, 151/16, 159, 161/3, 161/1, 158, 5/17, 137, 140/1, 135/1, 134,120/2, 120/3, 318, 132/3, 116, 126, 112, 313, 6, 167/5, 151/15, 302;2) Worpławki Precinct 0025: 2/6;3) Tolniki Małe Precinct 0021: 128/2, 166, 143/2, 167, 144, 186, 145, 194, 110, 136/3, 181, 192, 164, 75, 74, 57/2, 73, 72, 71, 149, 137/2, 76/1;4) Precinct Kępa Tolnicka 0006: 34/2, 48, 40/3, 41/2, 45. The Scope Of The Task Includes: Earthworks, Preparatory Works, Installation Works. The Construction Of A Water Supply Network In Rural Areas Is An Investment Of Strategic Importance For The Development Of The Local Community. The Investment Will Not Only Improve The Quality Of Life Of Residents, But Will Also Contribute To The Economic Development Of The Region And The Protection Of Water Resources. The Implementation Of The Order Must Be Carried Out In Accordance With The Principle Of Doing No Significant Harm To The Environment (Dnsh - Do No Significant Harm), Referred To In Art. 17 Of Regulation (Eu) 2020/852 Of The European Parliament And Of The Council And In The Regulations For Selecting Projects To Be Supported By The National Recovery And Resilience Plan.2. The Ordering Party Informs That The Implementation Of Water Supply Connections Is Not Within The Scope Of This Order. The Connections In Question Will Be Made By The Ordering Party On Its Own And At Its Expense. The Contractor Is Obliged To Cooperate With The Contractor Of The Connections In Terms Of Timely Coordination And Providing Access To The Construction Site.3. A Detailed Descr
|