|
The Subject Of The Order Are Construction Works On The Investment Project Titled: Reconstruction Of District Road No. 2536L - Stage Iv On The Section From Km 1+455.00 To Km 3+715.00. Description And Scope Of The Investment: The Scope Of The Investment In The Reconstruction Of The District Road No. 2536L Kurów - Wąwolnica On The Section From Km 1+455.00 To Km 3+715.0 Includes, Among Others: Road Industry: Demolition Works, Cutting Down Trees And Bushes, Reconstruction Of The Road Surface Of The District Road No. 2536L By:• Strengthening The Surface By Installing New Construction Layers,• Local Demolition Of The Existing Road And Its Reconstruction By Constructing A New Full Structure, • Adjustment Of The Edges Of The Road Surface To Ensure Its Basic Width Of 5.5 M, • Construction Of Sidewalks With A Surface Made Of Concrete Paving Stones. 6 Cm (Gray), 1.0 M - 1.7 M Wide, Including Pedestrian Crossings, - Construction Of Safety Belts (Road Edges) With A Surface Made Of Concrete Paving Stones. 6 Cm (Gray), - Construction Of Both Sides Of The Roadsides, Hardened With Stone Aggregate, Thickness. 15 Cm, - Construction Of Bus Bays With A Surface Made Of Concrete Paving Stones. 8 Cm (Graphite Color) With A Width Of 2.5 - 3.0 M, Including Platforms With A Surface Made Of Concrete Paving Stones. 6 Cm (Gray In Color) With A Width Of 1.0 M - 1.7 M, - Reconstruction Of The Intersections Of District Road No. 2536L With A Municipal Side Road By: • Demolition Of The Damaged Road At The Entrance Of The Municipal Side Road, • Construction Of A New Road Structure Of The Municipal Road, - Construction And Reconstruction Of Exits By Making New Surfaces: • Ground Surface Hardened With Crushed Aggregate Thickness. 15 Cm,• Z Betonowej Kostki Brukowej Gr. 8 Cm (Red), Bituminous, − Re-Paving (Height Adjustment) Of The Existing Hardened Surfaces Of Hardened Exits And Access Roads, − Reconstruction Of Existing Open Roadside Ditches, − Supplementing And Replacing Damaged Culverts Under The Exits Within The Existing Ditches, − Cleaning And Desilting Of Culverts Under The Crown Of The District Road, − Construction Of Covered Ditches From Pp Pipes Ø50 Cm Along With Concrete Inspection Wells Ø100 Cm, − Construction Of Concrete Inspection Wells Ø100 Cm Along The Culverts Under The Exits Of Considerable Length, − Construction Of Linear Curb Drainage, − Construction Of Class D400 Rain Inlets With Concrete Drainage Wells Ø50 Cm Along With Drainage Stubs Made Of Pp Pipes Ø20 Cm, − Construction Of Trough Edge Sewers Made Of Prefabricated Concrete Elements, − Construction Of Slope Drains From Prefabricated Concrete Elements, − Strengthening The Slopes Of Ditches By Topsoil And Sowing With Grass Mixture, − Local Strengthening Of Slopes And The Bottom Of Ditches With Concrete Openwork Slabs And Concrete Paving Slabs, − Installation Of Vertical And Horizontal Markings, − Installation Of Road Traffic Safety Devices: Guide Boards, Guide Posts, Balustrades. The Ordering Party Is In The Pr
|