Urban Railway Track Construction Works – Railway Market (Track And Catenary) Of Smr T13 Phase 2 (Ferro Smrs). The Services Of The Railway Contract (Track And Catenary) Relate To The Work Of The Railway Platform And Catenary As Part Of The Project To Extend The Existing Maintenance Workshop Of The Versailles Matelots Maintenance And Storage Site (Smr). The Purpose Of This Contract Will Be: • At The Level Of The Storage Tracks: O The Supply And Installation Of Insulators Necessary For The Electrical Protection Of The New Tracks; O Receipt Of The Basic Form Carried Out By The Vrd Market; O The Supply And Use Of Suitable Materials To Obtain A Railway Underlay That Complies With The Requirements Of The Cctp; O Pre-Ballasting Of The Tracks; O The Supply And Installation Of Running Track Materials And Track Devices As Well As Their Ballast And Leveling Up To The Finished Level Including The Creation And Adjustment Of Joints; O The Supply And Implementation Of Pédistrail Type Pedestrian Crossings Or Equivalents Necessary For Crossing The Tracks By Site Staff; O Carrying Out The Excavation/Concreting/Matting Operations Of The Necessary Additional Lac Supports; O The Supply And Installation Of All The Equipment Necessary For The Electrification Of The New Tracks (Transverse Gantry, Consoles, Earthing Terminal Disconnectors, Voltage Presence Lights, Etc.); O Unwinding Of The Cdpa As Well As The Contact Wire. • At Track 26: O The Construction Of Exterior Concrete Tracks Including The Supply And Installation Of Foundation Concrete And Cushioning Concrete, The Installation Of Track Material And The Installation Of Drainage Grate Gutters As Well As Their Connection To The Main Sewerage Network Carried Out By The Vrd Market Or Already Existing Since Phase 1; O Sawing Of Covering And Replacement Of Rail Necessary For The Installation Of Axle Counters According To Studies To Be Carried Out By The Signaling Market; O The Supply And Installation Of Tracks On Posts Under The Roof, Including The Supply And Installation Of Posts And The Filling By Concreting Of The Reservations Provided For In The Building Contract; O The Creation Of New Exterior Lac Supports Including The Construction Of The Massifs And Their Equipment; O The Creation Of The Harrows And Disconnectors Necessary For The Electrical Cutting Of The Track; O The Progress Of The Cdpa And The Necessary Contact Wires. • At Track 23: The Creation Of The Necessary New Lac Supports And The Modification Of The Existing Harrows To Allow 25 Kv/750 V Commutativity Of The Track (Excluding Electrical Wiring And Work On The Control Cabinets And Boxes). • In Terms Of Finishes: Descaling Of All The Rails Before Commissioning. • All Studies, Supplies, Controls And Verification As Well As All Tests Of The Work Cited Above. • Participation In Dynamic Tests And Overall Tests. The Work Must Minimize The Impact On The Operation Of The Maintenance And Storage Site, While
Contact Information
Address
39bis-41 rue de Châteaudun
Contact No.
+33147532873
Email
lucile.moity@iledefrance-mobilites.fr
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110497218
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.