|
1. The Subject Of The Order Is The Modernization Of The School Athletics Field And The School Multi-Purpose Sports Field Along With Accompanying Elements, Stage 4 - (On The Plot No. 633/14 In Starościn).2. The Scope Of Works Includes: 1) Renovation Of A Grass Pitch - Removal Of Existing Topsoil / Turf And All Impurities, Profiling Of The Area, Adjustment Of The Height Of Pvc Distribution Wells, Dismantling Of Existing Concrete Edges, Installation Of New Edges, Construction Of The Pitch With A Layer Of Soil Of Specific Mixtures, Profiling And Rolling Of The Pitch, Sowing Grass Mixture, Sowing Fertilizer), 2) Making A Run-Up For Javelin Throwing (Execution Channeling, Installation Of New Edges, Laying Of Geotextile, Execution Of The Structural Base, Laying Of The Wedging And Leveling Layer, Laying Of The Polyurethane Surface, Painting Of The Lines),3) Execution Of The Long Jump Run-Up (Construction Of The Groove, Installation Of New Edges, Laying Of The Geotextile, Execution Of The Structural Base, Laying Of The Wedging And Leveling Layer, Laying Of The Polyurethane Surface, Painting Of The Lines),4) Assembly Of The Threshold And The Pit With Sand For Long Jumps, Installation Of A Shot Put Ring And Others, 5) Installation Of Pitch Equipment Elements (Goals, Flags), 6) Painting Of All Lines Of The Pitch And Field Of Athletic Disciplines (Including Specific Competitions), 7) Installation Of Sprinkler Heads (The Ordering Partys Material), Adjustment And Commissioning Of The Irrigation System, 8) Construction Works On The Athletics Track, Drainage, Profiling And Installation Of Edges And A Linear Drain, 9) Assembly Linear Drain With Connection To The Existing Drainage System Of The Pitch,10) Regulation Of The Height Of Existing Sewage Manholes,11) Installation Of Installation Culverts,12) Construction Of Sidewalks Made Of Concrete Cubes,13) Construction Of A Retaining Wall From Prefabricated Concrete Elements,14) Construction Of A Fence With A Gate And Wickets,15) Performance Of Cleaning Works And Removal Of Rubble And Soil From The Construction Site.3. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 6 To The Swz, Which Consists Of The Following Documents: 1) Technical Description With A Drawing Part, 2) Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), 3) Bills Of Quantities, - Also Hereinafter Referred To As Design Documentation.
|