|
Construction Work - Development Of Large Investment Area Ig Hermsdorf Ost Iii, Lot 6 - Rainwater Systems Location A Civil Engineering Structure And Civil Engineering. Lot 6 Rainwater Systems, Location A Civil Engineering And Civil Engineering Construction Site Equipment, Construction Site Clearance, Area Paving And Construction-Related Access Roads, Setting Up, Maintaining, Operating And Clearing A Self-Sufficient, Mobile Power Supply System, Construction Site Lighting And Traffic Safety Sub-Object 4.2 - Rainwater Systems | Engineering Structures 4,000 M³ Topsoil Work 33,500 M³ Earthworks For Construction Pits And Pipe Trenches 9,750 M³ Soil Replacement And Terrain Regulation 1 Piece. Manufacture Of Rainwater Treatment Basins (Rkb), Closed, Volume Approx In In-Situ Concrete Construction Including Dewatering And Equipment 290 Pieces Of Micro Piles For Buoyancy Protection L = 6.00 M Including Separate Construction Site Equipment 1 Piece Of Idm Structure In In-Situ Concrete Construction, L X W X D = 5.75 X 3.30 X 5.90 M Incl. Equipment 1 Piece Of Rubble Trap In Prefabricated Construction L X W X D = 3.50 X 3.50 X 4.30 M Incl. Equipment 1 Prefabricated Shaft Structure L X W X D = 2.60 X 2.60 X 4.30 M Incl. Equipment 12 M Reinforced Concrete Pipes Dn 1,400 1,800 M² Asphalt-Bound Surface Paving For Maintenance Paths Incl. Drainage Facilities And Edging Sub-Object 4.5 - Rainwater Systems | Sewer And Discharge Structure 1,600 M³ Earthworks, Pipe Trenches Including Dewatering 850 M³ Soil Replacement 2,300 M² Shoring Work For Sewer Construction 40 M Reinforced Concrete Pipes Dn 1,400 240 M Pp Sewers Dn 300 6 Pieces Reinforced Concrete Shafts Dn 1,000, T 2.00 To 4.00 M 1 Piece Reinforced Concrete Shafts Dn 1,500, T Up To 5.00 M 1 Piece Reinforced Concrete Shafts Dn 2,500, T Up To 3.50 M 1 Piece Outlet Structure Dn 300 In Receiving Water 90 M Pipe Jacking (Micro-Tunneling) Under Bab Incl. Start And Target Pit, Dewatering And Shoring For Start And Target Pit, Intake Of Media Pipe Dn 300 In Stb Protective Pipe Dn 500 Including Separate Construction Site Facilities 150 M² Surface Demolition And Restoration Asphalt Base And Top Layers Bk. 0.3 - Bk 1.8 According To Rsto 370 M Sewer Inspection Up To Dn 1,400 Sub-Object 3.2 - Waste Water Systems 3,100 M³ Earthworks Pipe Trenches Including Dewatering 2,250 M³ Soil Replacement 7,000 M² Shoring Work For Sewer Construction 850 M Pp Sewers Dn 200 21 Pieces Of Reinforced Concrete Shafts Dn 1,000, T 2.00 To 4.00 M 1 Piece Of Reinforced Concrete Shafts Dn 1,500, T Up To 5.50 M 90 M Pipe Jacking (Micro-Tunneling) Under Bab Incl. Start And Target Pit, Dewatering And Installation For Start And Target Pit, Insertion Of Media Pipe Dn 200 In Stb Protective Pipe Dn 500, Including Separate Construction Site Facilities 2,100 M² Surface Demolition And Restoration Asphalt Base And Surface Layers Bk. 3.2 According To Rsto, Incl. Drainage Systems And Edging 360 M Road Marking Work 870 M Sewer Inspection Up To Dn 300 Sub-Object 5.4 - Water Supply Systems 2,700 M³ Earthworks, Pipe Trenches Including Dewatering 1,900 M³ Soil Replacement 5,000 M² Shoring Work For Pipe Construction 1,000 M Pe 100 Rc Od 250 Drinking Water Pipe 24 Pieces Ggg - Fittings Dn 200, Butterfly Valves, Fittings,
|