Landscaping Work – New Construction Of The Michaelmas School / Outdoor Facilities. The Measure Essentially Includes: - Earthworks And Subsoil Work - Drainage And Pipeline Construction Work - Creation Of Paved Areas - Structural Borders And Terrain Jumps - Creation Of A Natural Play Area - Construction Of A Climate Wall In The Southern Area Of The Property - Vegetation Work Including Completion And Development Maintenance - Delivery And Assembly Of Equipment ________________________________________ 3. Rough Quantities (Approx. Information) 3.1 Earthworks And Subsoil Work - Approx. 5,000 M³ Of Soil Loosened, Loaded And Mostly Removed - Approx. 10,000 M² Of Outdoor Area Areas Processed And Leveled - Approx. 3,500 M² Of Subsoil Stabilization In Some Areas 3.2 Drainage And Pipe Construction - Over 850 M² Of Rain And Dirty Water Channels Including Trenches - Created Approx. 700 M² Of Line Trenches - Delivered And Laid Over 1,000 M² Of Cables 3.3 Paved Areas And Edging - Approx. 5,500 M² Of Paved Areas Created Using Paved Construction - Approx. 350 M Of Building Edging Using Angle Stones And Lattice Construction As Constructive Wood Protection 3.4 Play Area Creation Of An Approx. 750 M² Large Play Area With Fall Protection Surfaces Made Of Fall Protection Wood As Well As Fall Protection And Play Sand. The Play Area Has An Extensive, Partly Natural Design Using: - Boulders - Lying Locust Tree Trunks - A Nest Swing - A Double Swing - A Large Play Area As A Low Ropes Course - A Climbing Play Area With An Integrated Play Tower. All Play And Equipment Elements Must Be Designed In A Uniform Manner And Have A Grass-Like Appearance. This Applies In Particular To The Visible Posts And Supporting Structures. 3.5 Equipment - Deliver And Install Approx. 12 Mast Lights - Approx. 100 Bicycle Parking Spaces Including Two Roofs - A Waste Enclosure - A Tool Shed - Various Equipment Elements (Including Waste Containers, Leaning Brackets) 3.6 Climate Wall A Climate Wall With A Length Of Approx. 135 M And A Height Of Up To 4.00 M Is To Be Built In The Southern Area Adjacent To The Public Footpath Network. The Climate Wall Serves: - To Bridge The Height Difference In The Terrain, - To Create A Functional And Design Demarcation Between The School Property And Public Space, - To Improve Microclimatic Conditions. 3.7 Vegetation Work - Create Approx. 6,000 M² Of Vegetation And Lawn Areas - Approx. 200 M Of Hedge Planting - Create 12 Tree Pits And Plant Trees - Deliver And Plant Approx. 4,500 Ground Cover, Shrub And Hedge Plants - Completion And Development Care In Accordance With The Relevant Regulations ________________________________________ All Services Are In Accordance With The Relevant Din Standards, The Recognized Rules Of Technology And The Specifications Of The Implementation Planning. The Quantities Given Represent Orientation Values; The Individual Items Shown In The List Of Services Are Decisive
Contact Information
Contact No.
05401850260
Email
a.huesmann@georgsmarienhuette.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110216979
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.