|
1. Name Of The Order: Comprehensive Energy Modernization Of The Building Of Municipal Kindergarten No. 4 In Iława.2. The Project Includes Insulating All External Partitions, Replacing The Joinery With New Ones, And Modernizing The Heating And Hot Water System. And The Use Of Renewable Energy Sources, In Particular: - Insulation Of External Foundation Walls With Polystyrene, - Insulation Of External Walls With Polystyrene, - Insulation Of The Floor On The Ground With Polystyrene, - Insulation Of The Ventilated Flat Roof With Mineral Wool, - Replacement Of Windows With New Ones, - Replacement Of External Doors With New Ones, - Modernization Of The Domestic Hot Water Installation: Installation Of An Air-To-Water Heat Pump, Modernization Of The Heating System: Replacement Of The Heating System With A Dual-Function One, Replacement Of Cables With New Insulated Ones, Replacement Of Radiators With Panel Ones With Thermostatic Valves, Replacement Of Lighting With New Ones - Led Luminaires, Construction Of A Photovoltaic Installation (On The Roof Of The Building), Reconstruction Of The Heat Connection From The Municipal Network, Application Of An Energy Management System, Energy Storage For The Photovoltaic Installation, Construction Of A Lightning Protection Installation, As Part Of Activities Related To Accessibility Include The Construction Of An Elevator Accessible From The Ground Level And Comprehensive Adaptation Of Toilets On All Floors To The Needs Of People With Disabilities. 3. The Contractor Will Provide Surveying Services For The Construction Of The Facility And Will Perform An As-Built Surveying Inventory.4. The Contractor Will Prepare As-Built Documentation (2 Copies In Paper Version And 1 In Electronic Version On Cd, In Pdf Format).5. The Ordering Party Informs That All Works Performed On The Facility Must Be Agreed With The User, As The Kindergarten Facility Will Operate Normally Throughout The Entire Period. Due To The Above, The Contractor Must Include The Costs Of Securing The Performance Of Works In The Offer Price. This Cost Should Be Included In Indirect Costs.6. The Subject Of This Agreement Is Co-Financed By The European Regional Development Fund, European Funds For Warmia And Mazury 2021-2027 Priority Fewm.02 Environment Measure Fewm.02.01 Energy Efficiency Scheme A (Public Buildings).7. Cpv Code: 45111000-8 Demolition Works, Earthworks, 45215000-7 Construction Works In The Construction Of Health And Social Care Buildings And Public Utility Facilities, 45421000-4 Joinery Works, 45432000-4 Laying And Tiling Of Floors, Walls And Wallpapering Walls, 45330000-9 Works Water, Sewage And Sanitary Installations, 45310000-3 Electrical Installation Works.8. A Detailed Description Of The Subject Of The Order In This Procedure Is Included In The Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), Bills Of Quantities, Swz, Contract Template And Annexes.
|