|
Work 1- General Mechanized Cleaning, Including Removal Of Vegetation Cover - Trunks With A Diameter Of Up To 10Cm - Without Transport, Work 1- Mechanized Loading And Removal Of Rubble, Including Transport Up To 1Km, Work 1- Removal Of Rubble With A Metal Bucket, Including Manual Loading And Unloading In Bota-Fora, Work 1- Transport Of Debris By Dump Truck, From 1Km, Work 1- Cutting, Clipping And Removal Of Trees Including Diameter Roots. ≫ 30 E ≪ 60Cm, 02/23/2026 - 11:55:29, Job 1- Cutting And Spreading Inside The Site, Job 1- Cutting And Loading For Disposal, Job 1- Supply Of Earth, Including Cutting, Loading, Unloading And Transport Up To 1Km, Job 1- Landfilling, Including Compaction, Job 1- Transport Of Earth By Truck Tipper, Job 1- Manual Excavation, Depth Equal To Or Less Than 1.50M, Job 1- Concrete Ballast, 150Kg Cim/M3, Job 1- Perforated Pvc Pipe For Drainage - Diameter 4 (100Mm), Job 1- Metal Siding With Metallic Tile, Unpainted, Trapezoidal 40 Esp=0.43Mm, Columns, Bases And Screws, Project 1- Screen For Protection Of Works, Mesh 2 Mm, Project 1- Concrete Drill - Diameter 25Cm, Project 1- Continuous Helix Excavated Pile - Diameter 50Cm, Project 1- Piping Of The Bottom Of Trenches, For Simple Regularization, With Vibrating Socket, Job 1- Crushed Ballast, Job 1- Basement Masonry - Common Solid Bricks, Job 1- Waterproofing The Back Of The Foundation - Waterproof Mortar, Job 1- Trench Backfilling, Including Piping, Job 1- Common Form Of Pine Boards - Flat, Job 1- Ca-50 Steel Reinforcement, Job 1- Concrete Fck=25Mpa - Machined, Job 1- Cardboard Tube Form, Diameter 350Mm, Job 1- Ca-60 Steel Reinforcement - Screen, Job 1- Concrete Fck = 25.0Mpa - Machined, Job 1- Concrete Fck = 30, Job 1- Concrete Pumping, Job 1- Slab Mixed Lattice H-8Cm With 4Cm (12Cm) Capping, Job 1- Surface Cleaning With Hydro-Blasting, Job 1- Mechanical Sanding On Concrete Surfaces, Job 1- Preparation And Application Of Stucco, Job 1- Concrete Polishing, Job 1- Supply And Assembly Of Vertical Metal Structure - Non-Skidable, Job 1- Supply And Assembly Of Vertical Metal Structure - Patinable, Project 1- Steel Structure For Stairs, Walkways And Marquises, Including Assembly, Project 1- Precast Concrete Structure - Supply And Assembly, Project 1- Vb.01 - Masonry In Concrete Blocks 19 X 19 X 39Cm, Project 1- Deployee Type Screen For Masonry Reinforcement, Job 1- Concrete Grout, Job 1- Concrete Lintels, Straps And Bollards, Job 1- Neocon Standard Sanitary Partition Or Similar, Job 1- Carpet Type Textile Acoustic Absorber, Job 1- Hollow Concrete Element - Type Neo-Rex N.16 Or Similar, Job 1- Demolition Of General Masonry (Bricks Or Blocks), Project 1- Mechanical Protection With Cement And Sand Mortar - Ratio 1:7, Average Thickness 30Mm, Project 1- Waterproofing Mortar With Cement, Sand And Water-Repellent, Project 1- Asphalt Blanket 4Mm Thick With Polyester Veil Glued With A Torch, Project 1- Bd.12 - Asphalt Emulsion-Based Waterproofing - Structured With Polyester Fabric - 2 Layers Of Structuring, Job 1- Asphalt Membrane Waterproofing - With 3 Layers Of 15Lbs Asphalt Felt, Job 1- Polyurethane-Based Elastic Mastic - Single-Component, Job 1- Supply Of Metallic Structure For Roofing, Job 1- Structure Assembly Metal For Roofing, Project 1 - Double Trapezoidal Tile In Galvanized Steel - E= 0.8Mm, Coating B, H=40Mm - Painted
|