|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Rental Of Container 2, 30 52M2, Made Of Resin Plywood, Including Furniture (Small Work, Effective Up To 30 Men), Der-Mg Standard, Rental Of Chemical Bathroom, Size (110X120x230)Cm, Standard Line, Containing 1 Sink/Hand Sanitizer, Including Maintenance And Mobilization/Demobilization, Rental Topographic Over Fifty (50) Reference Points, Including Marking Stake, Transport On Board With Truck/Trail With Equipment Board For Paving Works (Sinapi 91031), Tanker Truck 10,000 L Trucked, Total Gross Weight 23,000 Kg, Maximum Payload 15,935 Kg, Wheelbase 4.8 M, Power 230 Hp, Including Steel Tank For Water Transport - Daytime Chp. Af_06/2014, Pressurized Asphalt Spreader, 6 M3 Tank With Thermal Insulation, Heated With 2 Torches, With 3.60 M Spreader Bar, Mounted On Toco Truck, Pbt 14,300 Kg, Power 185 Hp - Daytime Chp. Af_05/2023, Team Leading The Work, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Horizontal Excavation In 1St Category Soil With Crawler Tractor (100Hp/Blade: 2, 19M3). Af_07/2020, Execution And Compaction Of Final Landfill Layer (100% Normal Proctor Energy) With Predominantly Clay Soil, In Layers 20 Cm Thick - Exclusive Of Excavation, Loading And Transport And Soil. Af_09/2024, Loading, Maneuvering And Unloading Soil And Granular Materials In A 10 M³ Dump Truck - Loading With Loader (Bucket From 1.7 To 2.8 M³ / 128 Hp) And Free Unloading (Unit: M3). Af_07/2020, Maneuvering And Unloading Soil And Granular Materials In A 10 M³ Dump Truck - Loading With Hydraulic Excavator (1, 20 M³ / 155 Hp Bucket) And Free Unloading (Unit: M3). Af_07/2020, Transport With 10 M³ Dump Truck, On Urban Road With Primary Coating (Unit: M3xkm). Af_07/2020, Regularization And Compaction Of Predominantly Clayey Soil Subgrade, For Pavement Construction Works. Af_09/2024, Gravel Acquisition, 20 M³ / 155 Hp) And Free Discharge (Unit: M3). Af_07, On Urban Road Under Primary Coating (Unit: M3xkm). Af_07, Construction Of Base And Sub-Base For Paving Granulometrically Stabilized Soil Without Mixing Soil - Excluding Soil, Excavation, Loading And Transport. Af_09/2024, Execution Of Priming With Asphalt Emulsion (102470), Execution Of Connection Painting With Asphalt Emulsion Rr-2C (104375), Transport With A 20,000 L Asphalt Material Transport Tank Truck, On Paved Urban Roads, Dmt Up To 30Km (Unit: Txkm). Af_07/2020, Additional For Dmt Exceeding 30 Km (Unit: Txkm). Af_07/2020, On Urban Road Under Primary Coating (Unit: Txkm). Af_07/2020, Load Of Asphalt Mixture In Dump Truck 10 M³ (Unit: M3). Af_07/2020, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Additional For Dmt Exceeding 30 Km (Unit: M3xkm). Af_07/2020, On Urban Road In Primary Coating (Unit: M3xkm)., Execution Of Pavement With Application Of Asphalt Concrete, Bearing Layer - Exclusive Cargo And Transport. Af_10/2025
|