Works For Complete Or Part Construction And Civil Engineering Work – Lakeside Design Fountain 2Nd Stage. The Historic Waterfront Promenade, Which Dates Back To The 19Th Century, Still Forms A Significant Part Of Brunnens Identity Today. The Measures To Upgrade And Renew The Lakeshore Facilities Are Not Intended To Cover Up These Traces, But Rather To Support The Original Concept. Umbrella-Shaped Plane Trees Are Being Replanted Along The Quays As A Key Tree Species. The Second Stage Of The Lakeshore Design Covers The Entire Area Around The Schiffländeplatz, From The Beginning Of The Waldstätterquai To The Bellevuequai And On The North Side To The Plot Boundary Of The Buildings Bordering The Square. To The East Of The Boat Landing There Is A Bank Staircase, Similar To The Staircase At Waldstätterquai (1St Stage), Which Allows Access To The Lake Across A Wide Front. The Bank Stairs Are Made From Prefabricated Concrete Elements That Are Supported On Piles. The Sea Wall Is Being Rebuilt. To Ensure That The Driftwood Does Not Accumulate Behind The Bank Structure, Gratings Are Installed Between The Individual Steps. To The West Of The Station Building To Connect To The Sea Stairs Of The First Stage, A Small Section Of The Existing Sea Wall Must Be Supported With Sheet Piling, As This Area Is Heavily Eroded And The Wall Is Already Leaning Towards The Lake.
Contact Information
Address
Parkstrasse 1
Contact No.
+41418250500
Email
info@ingenbohl.ch
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109469213
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.