Landscaping Work – New School Campus In Deisenhofen - Landscaping Work. Landscaping Work For The Construction Of The Deisenhofen School Campus (Work Area: Approx. 58,000 M²), Divided Into The Following Construction Areas And Areas: Sports Field (Construction Area 1), Vogelherdweg Traffic Facilities (Construction Area 2), Surfacing Work Tg (Construction Area 3), Multi-Purpose Hall (Construction Area 4), Secondary School (Construction Area 5), Fos & Anger (Construction Area 6), Common Use Area (Construction Area 7), Additional Electrical Work Development (Area 8) And Floor Storage (Area 9). Type And Scope Of The Service In Detail: - Construction Site 1 (Sports Field): Mow The Area And Clear Away Plant Cover Approx. 2,615 M²; Tear Down The Fence And Dispose Of It Approx. 558 M; Break Up Bituminous Covering Approx. 573 M²; Create Pipeline Trenches Approx. 645 M; Deliver And Install Natural Stone Blocks Approx. 30 Pieces; Gravel Base Layer Approx. 156 M³; Edge Edging Of Large Granite Stone Approx. 272 M; Area Division Concrete Paving In One Row, Approx. 712 M; Asphalt Path Approx. 420 M²; Paving Concrete Slabs Approx. 139 M²; Concrete Curb Approx. 558 M; Synthetic Surface Running Track Approx. 986 M²; Synthetic Surface, All-Weather Pitch, Small And Large, Approx. 1,991 M²; Ball Stop Fence Approx. 218 M; Trees Approx. 21 Pieces As Well As Completion And Development Care. - Construction Site 2 (Vogelherdweg Traffic Facilities): Break Up Bituminous Surface Approx. 743 M²; Create Pipeline Trenches Approx. 210 M; Correct Frost Protection Layer Approx. 743 M²; Edge Edging Of Large Granite Stone Approx. 390 M; Area Division Concrete Paving In One Row, Approx. 712 M; Road Asphalt Approx. 825 M²; Banquet Approx. 195 M² And Cable Protection Pipe Approx. 191 M. - Construction Area 3 (Flooring Work Tg): Dispose Of Floor Approx. 350 M³; Pipeline Trenches Are Approximately 434 M Long; Drainage Channel Approx. 70 M; Gravel Base Layer Approx. 3,530 M²; Concrete Curb Approx. 170 M And Concrete Paving Approx. 3,410 M². Construction Site 4 (Multi-Purpose Hall): Dispose Of Soil Approx. 210 M³; Mow The Area And Clear Away Plant Cover Approx. 400 M²; Break Up Bituminous Covering Approx. 150 M²; Create Pipeline Trenches Approx. 658 M; Lamp Foundation Mast Lamp Approx. 21 Pieces; Road Drain Approx. 26 Hours; Drainage Channel Nw 100-300 Approx. 63 M; Cast Iron Grate Cover D400 Approx. 128 Pieces; Grating In Several Parts, Approx. 113 M²; Grid Clean Running Freezer 2 To 60 Pieces Approx. 9 Pieces; Leak Test Tg/Ug Ceiling Approx. 4,885 M²; Protective Layer 500G/M² Approx. 4,885 M²; Retention Box Approx. 842 M²; Drainage And Water Storage Element Approx. 1,185 M²; Deliver And Install Natural Stone Blocks Approx. 33 Pieces; Angle Support Element Prefabricated Concrete Part H 45 Cm Approx. 225 Pieces; Angle Support Element Prefabricated Concrete Part H 55 Cm Approx. 118 Pieces; Gravel Base Layer Approx. 775 M³; Tactile Guidance System Granitdreizeiler Approx. 164 M; Edge Edging Of Large Granite Stone Approx. 364 M; Trough Channel 5-Row Granite Approx. 214 M; Paving Concrete Slabs Approx. 988 M²; Paving Ceiling Concrete Paving Approx. 590 M²; Asphalt Path Approx. 2,010 M²; In-Situ Concrete Access Tg Approx. 390 M²; Fall Protection Wood Chips Approx. 105 M²; Combined Shot Put/Beach Volleyball Court Approx. 397 M²; Bicycle Racks Approx. 252 Pieces; Outbuilding Approx. 1 Hour; Outdoor Spor
Contact Information
Contact No.
+4989613770
Email
ausschreibung-schulzweckverband@oberhaching.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109468950
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.