|
Painting Work Of Buildings – Ve 67.2 - Painting Work Level 1, Complete Renovation Of Potsdam Town Hall, 14469 Potsdam. Ve 67.2 - Painting Work Level 01: Measures To Optimize Space Securing: - Protect 1,500 M2 Of Components - Cover 3,000 M2 Of Floor Surfaces - Cover 150 Pieces Of Radiators - Cover 5 Pieces Of Stucco Rosettes Demolition Painter: - Remove 50 M2 Of Wallpaper From Walls - Remove 25 M2 Of Wallpaper From Ceilings - Remove 10 M Of Wallpaper From Reveals - Remove 100 Pieces Of Dowels, Nails Preparatory Work: - Close 100 Dowel Holes, - Sand Down 200 M2 Of Existing Coating On The Inside, - Remove 3,000 M2 Of Old Coating, - Sand 150 M2 Of Existing Coating, - Remove 15 Pieces Of Existing Coating On Stucco Rosettes, - Remove 300 M Of Existing Coating On Stucco Moldings, - Remove 15 Pieces Of Existing Coating On Stucco Rosettes Using The Jos Process, - Apply 300 M Of Existing Coating Using The Jos Process Remove Stucco Moldings, Substrate Preparation: - Fill 5,382 M2 Of Plastered Areas Q3 - Partially Fill 1,285 M2 Of Plastered Areas - Fill 1,383 M Of Soffits - Fill 300 M2 Of Supports - Fill 2,816 M2 Of Ceiling Area - Fill 2,078 M Of Ceiling Valley - 1,847 M2 Of Primer, Walls, Drywall - 482 M2 Of Primer Ceilings Drywall - 6,767 M2 Primer Wall Area Plaster - 1,383 M Primer Reveal Plaster - 300 M2 Primer Supports - 2,816 M2 Primer Ceilings - 2,078 M Primer Ceiling Valley - 15 Pcs Primer Stucco Rosettes - 300 M Primer Stucco Moldings - 100 M2 Insulating Paint Walls - 50 M2 Insulating Paint Ceilings Wallpapering Painter: - 200 M2 Painters Fleece Drywall Walls - 3,000 M2 Painters Fleece Plastering Surfaces Walls - 1,383 M Painters Fleece Soffits - 300 M2 Painters Fleece Supports - 2,816 M2 Painters Fleece Ceilings Plaster - 2,078 Ceiling Valley Coating: - 1,847 M2 Coating Walls Drywall - 482 M2 Coating Ceilings Drywall - 6,767 M2 Coating Walls Plaster - 1,383 M Coating Reveals - 300 M2 Coating Supports - 2,826 M2 Coating Ceilings Plaster - 2,078 M Coating Ceiling Valley - 500 M2 Allowance Medium Tint - 500 M2 Allowance Rich Tint - 15 Pieces Coating Stucco Rosettes - 300 M Coating Stucco Moldings - 1,090 M Coating Heating Pipes - 107 M2 Coating Of Cast Fins Radiators - 9,000 M Of Acrylic - 2,039 M Of Coating Of Skirting Boards Support Measures: Securing: - 500 M2 Of Components Protecting - 900 M2 Of Covering Floor Surfaces - 50 Pieces Of Radiators Covering - 5 Pieces Of Covering Stucco Rosettes Demolition Painter: - 20 M2 Of Wallpaper Remove Walls - 20 M2 Of Wallpaper Remove Ceilings - 5 M Of Wallpaper Soffits Remove - 50 Pieces Of Dowels, Remove Nails Preparatory Work: - Close 50 Pieces Of Dowel Holes, - Sand Down 100 M2 Of Existing Coating On The Inside - Remove 1,500 M2 Of Old Coating - Sand 75 M2 Of Existing Coating - Remove 15 Pieces Of Existing Coating On Stucco Rosettes - Remove 150 M Of Existing Coating On Stucco Moldings - Remove 15 Pieces Of Existing Coating On Stucco Rosettes Using The Jos Process - 150 M Remove Existing Coating On Stucco Moldings Using The Jos Method. Surface Preparation: - Fill 2,103 M2 Of Plastered Surfaces Q3 - Partially Fill 526 M2 Of Plastered Surfaces - Fill 1,125 M Of Reveals
|