|
1. The Subject Of The Order Is The Performance Of Construction Works For The Task Titled: Construction Of A Brine Graduation Tower, Bridges, Gazebos, Bicycle Shelters, Small Architectural Objects And Accompanying Infrastructure In The Area Adjacent To The Water Reservoir In Biała Podlaska. The Area Is Located On The Southern Side Of The Krzna River, Along The Flood Embankment And Around The Existing Water Reservoir Located Between The Market Place At Ul. Aleja Tysiąclecia And Ul. Łomaska And Includes Plots No. 1020/28 And 1020/29 Within 0003 In Biała Podlaska.2. The Subject Of The Order Includes In Particular The Following Scope Of Works: 1) Development Of A Water Reservoir By Building Bridges, A Gazebo On The Water, A Floating Duck House, Cleaning The Reservoir Of Dirt And Garbage Without Disturbing The Existing Vegetation; 2) Construction Of Small Architectural Objects Such As: A Brine Graduation Tower, Modular Seats, Park Benches, Waste Bins, Deckchairs And Hammocks, Relaxation Gazebos, A Family Gazebo With A Changing Table, Tables For Chess Games, Ping Pong Tables, Playground Equipment, Duck Locker (With Food For Ducks), Bicycle Shelter, Bicycle Racks, Field Gym Equipment, Bicycle Repair Station, Wooden Pergolas, Information And Educational Boards, 3) Construction Of A Sandy Recreation Area Equipped With Posts And Nets, 4) Construction Of A Sand Beach, 5) Construction Of Pedestrian And Bicycle Paths And Improvement Of The Existing Ones, 6) Construction Of Electrical Networks And Installations, Lighting And Telecommunications,7) Installation Of Lighting Fixtures And Cameras (Lighting - 36 Poles, Monitoring - 10 Cameras, Including 4 Counting Cameras With Licenses And A Media Converter, Counting Cameras In Ip Technology, With A Minimum Resolution Of 2688X1520, With A 2.8-12Mm Lens (Motozoom With Autofocus), Equipped With A Microsd Card Slot, With An Ir Illuminator Enabling Work With Poor Lighting. The Cameras Must Have The Function Of Counting Entries/Exits Via Virtual Lines Or Zones With Movement Direction Detection And Enable The Generation Of Daily, Monthly And Annual Reports), 8) Water Fountain With Water Connection, Measurement, Water Testing, 9) Planting Of Low And High Greenery, 10) Dismantling Of Old Wooden Gazebos, Fences, Playground Equipment And Outdoor Gym, Electric Poles, Other Small Architecture Along With Transport To The Indicated Place In The City Of Biała Podlaska, 11) Commissioning Of The Graduation Towers And Spring Inspections, Including Commissioning Within The Time Of The Granted Warranty, Including Supplementing The Missing Blackthorn Tendrils. The Contractor Is Responsible For The Supply Of Salt For The First Start-Up And During The Warranty Period (3 Tons Of Salt For Each Year Of The Warranty).12) Delivery Of Two Plastic Tanks With A Capacity Of 1M3 Each For Brine Preparation (Including One Equipped With A Mixer And 2 Pumps (Including 1 Emergency) For Pumping Brine) - Tanks Adapted For Transport,13) Tidying Up The Are
|