Construction Work – Skv Žilina – Reconstruction Of Supply Pipes From The Turia Water Source – Stage I.. The Subject Of The Order Is: Reconstruction Of The Supply Pipeline From The Turia Plant - 1St Stage. It Starts Before Pd In The Village Of Rosina. Here It Connects To The Existing Supply Pipe, Passes Above The Cooperative To The Asphalt Road, Where It Is Led To The Gardening Settlement In Front Of The Forest. This Is Where The Asphalt Road Ends And The Unpaved Dirt Road Continues To The Front Of The Forest Park. The Pipeline Will Go To The Forest Park, To The Pavement Made Of Interlocking Paving, Up To The Shaft Of The As Chrasť. It Will Be Terminated In The Shaft. The Entire Length Of The Pipeline Is 2,920.22 Designed From A Dn 300 Ductile Iron Pipe. The Used Elbows And Fittings Are Also Designed From Ductile Iron. Two Types Of Cast Iron Pipes Are Proposed. The Main Part Will Be Natural Biozinalium® Pipes, And In Places Where There Is Crossing With El. Hv Management Or Standard Tt-Pe Pipes With A Single-Chamber Neck Will Be Used For Vtl Gas. A Dn 80 Underground Hydrant Will Be Installed At The Point Of Connection To The Existing Dn 200 Steel Water Pipe, Which Will Serve To Clear The Pipe During Its Cleaning. At The Highest Points Of The Route, Deaeration And Aeration Sets Will Be Installed, And At The Lowest Points, Pipe Desilting Will Be Ensured During Cleaning. This Sludge Removal Will Be Solved By Opening The Pipeline Into A 10 M3 Storage Tank, Which Will Be Built Next To The Pipeline For This Purpose. Subsequently, The Water From The Tank Is Pumped Into The Cistern. The Reconstruction Of The Supply Pipe Within The I. Stage Will Consist Of The Reconstruction Of The Oc Dn 200 Pipe To A Ductile Iron Pipe Dn 300 With A Length Of 2920.22 M, The Reconstruction Of Aš Chrasť (New Fittings, Closures, Lv Connection And Data Transfer To Dispatching) And The Construction Of A New Turia Reduction Shaft With Data Transmission To Dispatching. Within The Framework Of The I. Stage, Three Modifications Of The Water Supply System Will Also Be Carried Out: 1) Termination Of The Lt Dn 125 Water Supply System In The Dss Area 2) Termination Of The Lt Dn 150 Water Supply System In The Village Of Turie - Interruption And Installation Of An Underground Hydrant In The Village Of Turie 3) Connection Of The Lt Dn 150 And Lt Dn 125 Pipelines And Interruption For The Connection In The Village Of Turie
Contact Information
Address
Bôrická cesta 1960
Contact No.
+421903804008
Email
drahoslorinc@outlook.sk
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109250632
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.