1. Description Of The Subject Of The Order: Reconstruction Of Municipal Road No. 184534N Ul. Podzamcze In The Town Of Lidzbark.2. As Part Of The Investment Project Involving The Reconstruction Of Municipal Road No. 184534N Ul. Podzamcze In The Town Of Lidzbark, Plot No. 72, 129, 238, 258 Lidzbark District, Działdowo Poviat, The Scope Of Works Adopted Is: 1) Designed Area Developmenta) Technical Parameters: - Technical Class: Municipal Road No. 184534N - Access D, - Traffic Category Kr 1, - Design Speed Vp = 30 Km/H, The Geometric Parameters Of The Road Are The Following: - Road Width - 5.8-6.4 M, - Road Length 180.0 M, - Asphalt Concrete Surface, - Transverse Slopes - One-Sided Up To 2%, Roof Slopes Up To 3%, B) Designed Height Solutions: The Height Solution For The Road Renovation Was Designed To Ensure Proper Drainage Of The Road Surface. Transverse Slopes Of The Road On One Side Up To 2% And Roof Slopes Up To 3%. C) Designed Normal Cross-Sections: Road Width 2X2.9-3.2 M. One-Sided Transverse And Roof Slopes. The Size Of The Declines Is Up To 3%. Asphalt Concrete Surface, Thick. 4Cm (Wearable Surface).D) Designed Surface Structureroadway - Wearing Course Of Asphalt Concrete Ac 11 S Thick. 4 Cm, Leveling Layer Of Asphalt Concrete Ac 16 W, Thick. Up To 3 Cm, Existing Bituminous Surface To Be Milled (Partially). E) Service Channel - Not Applicable. F) Drainage: Rainwater From The Road Will Be Discharged Through Transverse And Longitudinal Slopes To The Existing Efficient Rainwater Drainage System. This Should Be Done By Vertical Adjustment Of The Existing Street Inlets.2) Works Technologythe Execution Of Road Works Should Begin With Marking Out The Road Axes. Road Works Should Be Divided Into Sections (Ending In The Intersection Or Fork Zone) And The Works Should Be Carried Out In Sections To Perform The Full Range Of Works On A Given Section. The Technology And Sequence Of Road Works Will Include The Following Types Of Works Given In The Order Of Their Implementation: A) Preparatory Works: Preparatory Works Consist In Marking Out The Road And Milling The Existing Road Surface. B) Surface Works - Surface: Perform The Bituminous Surface In The Road Area Mechanically Or Manually. C) Road Works Will Be Performed On The Existing Road And Will Consist In Laying The Road Surface While Maintaining Normative Distances To The Existing Underground Technical Infrastructure Not Related To The Road Infrastructure.3) Additional Conditionsthe Road Surface Should Be Made Of Materials With Certificates, Technical Certificates And Certificates Of Conformity In Accordance With The Requirements Of Polish Standards. Carry Out The Works After Informing The Network Administrators Located In The Work Zone About Commencing The Works In Compliance With The Conditions Specified By Them. If Elements Of Historic Objects Or Devices Or Ancient Cultural Goods Are Found, Report Their Occurrence To The State Services Appointed For This Purpose.4) Traffic Organization Design - Not
Contact Information
Address
Gmina Lidzbark,Lidzbark,13-230,Warmińsko-Mazurskie,Pl621 - Elbląski
Email
umig@lidzbark.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109245046
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.