|
1. The Subject Of The Order Is The Performance Of Maintenance Works On Melioration And Drainage Devices Owned By The Sulechów Commune. The Scope Of Work Will Be Determined By A Written Typing Report, While The Number Of Services To Be Performed Will Depend On The Current Needs Of The Ordering Party And The Amount Of Financial Resources Allocated In The Budget For The Implementation Of This Task. A Detailed Description Of The Subject Of The Order Is The Price Form - Annex No. 1A To The Swz And Other Provisions Of The Swz, Including The Draft Contract - Annex No. 3 To The Swz.2. The Type Of Maintenance Work Is As Follows: No. Description Of Works:1. Manual Cutting And Grubbing, Bushes And Dense Undergrowth2. Mechanical Tree Felling With Stump Grubbing, Tree Diameter 10-15 Cm3. Mechanical Tree Felling With Stump Grubbing, Tree Diameters 16-25 Cm4. Mechanical Tree Felling With Stump Grubbing, Tree Diameters 26-35 Cm5. Mechanical Tree Felling With Stump Grubbing, Tree Diameter 36-45 Cm6. Mechanical Tree Felling With Stump Grubbing, Tree Diameters 46-55 Cm7. Mechanical Tree Felling With Stump Grubbing, Tree Diameters 56-65 Cm8. Mechanical Tree Felling With Stump Grubbing, Tree Diameter 66-75 Cm9. Removal Of Logs, Stumpwood And Branches, Transport Up To 2 Km, Logs10. Removal Of Logs, Stumpwood And Branches, Transport Up To 2 Km, Stumpwood11. Removal Of Logs, Stumps And Branches, Transport Up To 2 Km, Branches12. Clearing The Area Of Remnants After Clearing, Small Branches, Roots And Bark Without Heather, Including Removal13. Mowing Lichens, Manually From Slopes, Dense, Hard Lichen14. Mowing Lichens Manually From The Bottom Of Streams, Dense, Hard Lichen15. Raking Out Mown Lichens And Removing The Scum Of Floating Plants And Lichens Of Rooting Plants. Raking Out Mown Lichens From Slopes, Slope Width Over 2.0 M16. Raking Out Mown Lichens And Removing The Scum Of Floating Plants And Lichens Of Rooting Plants, Raking Out Mown Lichens From The Bottom Of Streams, Slope Width Over 2.0 M17. Desilting Of Watercourses With An Excavator, Silt Layer Thickness 20 Cm, Watercourse Bottom Width 0.40 M18. Desilting Of Watercourses With An Excavator, Silt Layer Thickness 20 Cm, Watercourse Bottom Width 0.80 M19. Desilting Of Watercourses With An Excavator, Silt Layer Thickness 20 Cm, Watercourse Bottom Width 1.20 M20. Desilting Of Watercourses With An Excavator, Silt Layer Thickness 40 Cm, Watercourse Bottom Width 0.40 M21. Desilting Of Watercourses With An Excavator, Silt Layer Thickness 40 Cm, Watercourse Bottom Width 0.80 M22. Desilting Of Watercourses With An Excavator, Silt Layer Thickness 40 Cm, Watercourse Bottom Width 1.20 M23. Distribution Of Excavated Material After Mechanical Desilting Of Watercourses (Excavated Material Deposited On One Side), Silt Layer Thickness 20 Cm, Stream Bottom Width Up To 0.6 M24. Distribution Of Excavated Material After Mechanical Desilting Of Watercourses (Excavated Material Deposited On One Side), Silt Layer Thickness 20 Cm, Stre
|