Structural Shell Work – Rohbauarbeiten, 3. Ba. - Residual Excavation Of Construction Pit, 2,450 M3 - Backfilling With Delivery Gravel F1, 4,220 M3 - Rc Concrete Type 1 (Ceilings), 2,445 M3 - Co2-Reduced Concrete (Floor Slab + Walls), 3,125 M3 - Waterproof Concrete Proportion Of Co2-Reduced Concrete, 2,325 M3 - Hollow Body For Weight Reduction, 1,450 M2 - Formwork, 20,860 M2 - In-Situ Concrete Balconies And Canopies Above. 1St Floor And 2Nd Floor Including Formwork, 760 M2 - Concrete Steel Bars/Steel Mats, 1,050 T - Stainless Steel Profiles And Welded Parts, 10 T - Mw Walls Made Of Sand-Lime Bricks D 17.5 And 20 Cm, 250 M2 - Pmbc Sealing, 1,100 M2 - Fresh Concrete Composite Film Sealing, 2,100 M2 - Vapor Barrier Ceiling Above Ground, 950 M2 - Bitumen Sealing Of Floor Slab On Top Side, 370 M2 - Flk Sealing And Balcony/Canopy Sealing, 800 M2 - Perimeter Insulation, 4,020 M2 -- Pre-Painting/Wall And Ceiling Painting Technical/Installation Areas, 1,340 M2 - Floor Coatings In Technical/Installation Areas, 250 M2 - Laying Electrical Conduits In Concrete, Approx. 4,500 M - Electrical Concrete Insert Boxes, Approx. 1,150 Pieces
|