1. The Subject Of The Order Includes The Execution Of Construction Works Together With Complete Equipment, Accompanying Infrastructure And Land Development In The Scope Of The Investment Project Entitled: Expansion Of The Selective Collection Point For Municipal Waste In The Uniejów Commune 2. The Plot Covered By The Subject Land Development Project Is Located In Uniejów At Ul. Dąbska, In The Area Of Plots No. 1701/4, 1704/1, 1705/1, 1708/1, 1709/1, Precinct 1 Commune. Uniejów. The Indicated Area Of The Pszok Area Together With The Planned Road Is 8,300 M2. The Investment Is Located In The Area Adjacent To The Existing Sewage Treatment Plant. 3. The Scope Of The Investment Includes: 3.1 Preparatory And Demolition Works (Concrete Block Surface, Fencing, Lighting) 3.2 Sheds For Waste Storage Facility With Steel Structure - Side And Rear Walls Made Of Trapezoidal Sheet Metal, Single-Pitch Roof Made Of Steel Structure Covered With Trapezoidal Sheet Metal, Slope Inclination Of 5°. Shed Dimensions: 30.30 X 12.29 M, Height At The Highest Point 5.00 M. Shed Development Area 372.40 M23.3 Concrete And Polymer Square For Waste Containers - With An Area Of 507.90 M2. Construction Of The Polymer Square: - Substructure Made Of 27 Cm Of Crushed Aggregate 0/31.50 Mm - Base Concrete C12/15 Thickness. 10 Cm - 2 Layers Of Insulating And Slippery Pe Foil 0.3 Mm Thick - Concrete Slab Made Of C25/30 Concrete With Dispersed Polymer Reinforcement (1.5%) Thick. 20 Cm3.4 Container For Hazardous Waste. The Facility Has External Dimensions Of 6.50 X 2.30 M And A Height Of 2.90 M, Single-Space, Steel Structure. Building Area 14.95 M2. Container Walls Made Of Trapezoidal Sheet Metal, Roof Covered With Trapezoidal Sheet Metal, 120 Mm Thick Mineral Wool Insulation. A Stainless Steel Drip Tray Covers The Entire Floor Area, Covered With A Stainless Steel Grate. Container Equipped With A Double-Leaf Gate With Dimensions Of 2.40 X 2.00 M. 3.5 Entrance And Maneuvering Area - With An Area Of 2987.34 M2 Construction: - Cement-Stabilized Base 20 Cm Thick With Rm = 2.5 Mpa - Crushed Aggregate 0/31.50 Mm, 25 Cm Thick - Layer Of Gravel, Thick. 4 Cm - Bevelless Concrete Cube Of The Behaton Type, Thick. 8Cm3.6 Work In The Field Of Insulating Greenery And Green Areas, 3.7 Educational And Information Boards, 3.8 Fence With A Sliding Gate The Scope Includes The Replacement Of The Existing Fence With A New One With A Total Length Of 279.2 Meters. With Two Sliding Gates, 6M And 5M Wide And 1.7M High. The Gates Are Equipped With A Barrier With A 24V Motor And A Control Panel. Parameters Of The Planned Panel Fence: - Height Above The Ground Surface: 170 Cm - Cross-Section Of The Post; 4X6cm - Concrete Foundation - Thickness Of Horizontal Wires: 5Mm - Thickness Of Horizontal Wires: 5Mm - Mesh Size: 5X20 93.9 Parking Spaces, Including For Disabled People 3.10. Networks And Installations: Water Supply, Electricity. Power Supply From The Existing Transformer Station As Part Of The Power Reserve.
Contact Information
Address
Gmina Uniejów,Uniejów,99-210,Łódzkie,Pl714 - Sieradzki
Email
urzad@uniejow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109116031
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.