|
Prior Consent For Drilling Next To Drh – Sema Com Art, Project Forwarding Grant Of Water Use To The Competent State Body With Art, Transport And Assembly Of Equipment, Construction Site Installation, Drilling In 6” Up To 100M, 02/13/2026 - 10:20:37, 02/13/2026 - 10:20:38, Drilling In 6” From 100 To 200M, Drilling In 6” From 200 To 300M, Reopening 12” To Rock, Cleaning And Development Of The Well, Casing Of 6” Geomechanical Tube With Diameters Of 150Mm And Thickness Of 4Mm, Geomechanical Screwable Sleeve Of 6, 6 Geomechanical Screwable Cap, Cementing Of The Ring Space, Protection Slab (Sanitary Seal), 24H Flow Test, Physical-Chemical And Bacteriological Analysis/Including Arsenic Analysis, Prior Hydrogeological Study Services Of The Area To Be Drilled, Chlorine Doser, Complete Multijet Hydrometer Type Magnetic Transmission Thread 1.1/2 10 M³/H Material Must Comply With Inmetro Ordinance 246/2000, Tamponing Service, Submerged Motor Pump 14 Stages And 2 Hp Of Power, Submerged Motor Pump 35 Stages And 5 Hp Of Power, Submerged Motor Pump 32 Stages And 2 Hp Of Power, Submerged Motor Pump 25 Stages And 5 Hp Of Power Power, Submerged Motor Pump With 21 Stages And 3 Hp Of Power, Submerged Motor Pump With 30 Stages And 3 Hp Of Power, Submerged Motor Pump With 16 Stages And 4 Hp Of Power, Submerged Motor Pump With 22 Stages And 6 Hp Of Power, 24-Hour Flow Test With Issuance Of A Report At The End Of The Test Description Of The Tested System, Water Analysis – Physical Chemistry, Arsenic Test Included, 20Mm Pvc Monitoring Tube, Complete Multijet Hydrometer Type Magnetic Transmission Thread 1.1/2 10 M³/H, Galvanized Carbon Steel Tube 1/1/4 Minasfil Electrical Cables, Galvanized Parallel Sleeve 1 1/4, Galvanized Bend 1 1/4, Galvanized Nipple 1 1/4, Galvanized Union Sleeve 1 ¼ Iron Seat, Horizontal Check Valve 1 1/4, Reduction Bushing 1 1/2 40 X 1 1/4, Labor For Motor Pump Installation
|