The Subject Of The Order Is The Implementation Of A Project In The Design And Build System Under The Name: Expansion Of The Sanitary Sewage System, Ul. Kasztanowa In Skrewlno. The Subject Of The Project Is The Design And Construction Of A Sanitary Sewage System In A Housing Estate Of Single-Family Houses In Skrewlno. The Project Will Be Located At Kasztanowa Street In Skrewlno. The Sanitary Sewage System Will Be Built On Plots Marked With Geodetic Numbers: 59, 58/2, 64, 65, 63/5, 68/5, 67/5, Skrewlno Registration District. As Part Of The Constructed Sanitary Sewage Network, It Will Be Possible To Connect Plots Marked With Geodetic Numbers: 60/1, 60/5, 60/7, 61/2, 61/4, 62, 63/6, 63/7, 63/8, 63/9, 63/1, 63/2, 63/3, 63/4 To The Implemented Infrastructure, 61/5, 61/6, 61/1, 60/8, 60/6, 66/7, 66/9, 66/10, 66/11,67/1, 67/2, 67/3, 67/4, 67/6, 67/7, 67/8, 67/9, 68/1, 68/2, 68/3, 68/4, 68/9, 68/8, 68/7, 68/6, 69/1, 58/1 Skrewlno Registration District. The Scope Of The Project Includes: - Preparation Of Complete Design And Construction Documentation Along With Obtaining, On Behalf Of The Skrewlno Commune, The Necessary Decisions And Permits, Including A Building Permit Decision, - Performance Of Construction And Assembly Works Based On Design And Construction Documentation, - Carrying Out The Required Tests And Examinations And Preparing Documents Related To Putting The Sanitary Sewage Network Into Operation And Obtaining An Occupancy Permit On Behalf Of The Skrewlno Commune. Construction Works Related To The Implementation Of The Project Concern The Construction Of A Gravity-Pressure Sanitary Sewage System In Kasztanowa Street In Skrewlno. The Implementation Of The Investment In The Field Of Construction Works Includes: 1) Connection Of The Property In The Number Of 40 Single-Family Residential Buildings, 2) Construction Of Ø200mm Gravity Sanitary Sewers, 1000 M Long, 3) Construction Of Ø160mm Connections From The Main Sewers To The Property Boundary, 182 M Long, 4) Construction Of 90/110 Pressure Pipelines, 75 M Long, 5) Construction Of A Network Sanitary Sewage Pumping Station In The Amount 1 Set. The Project Area Is Characterized By A High Level Of Groundwater, Hence The Need To Implement Investments In Organizing Water And Sewage Management In The Area Covered By The Project. Due To The High Level Of Groundwater, During The Execution Of Construction Works In The Field Of Excavations, It Is Necessary To Provide An Appropriate Drainage System For These Excavations Using Wellpoints To Ensure The Effectiveness And Durability Of The Works Performed. The Aim Of The Project Is To Ensure Effective And Hygienic Disposal Of Domestic Sewage From The Project Area In Order To Protect Public Health, The Environment And Water Resources. A Detailed Description Of The Subject Of The Order Is Included In The Functional And Utility Program Constituting Annex No. 9 To The Swz.
|