|
1. The Subject Of The Order Are Works Related To The Ongoing Maintenance Of District Roads In The Radom District In 2026, Including In Particular The Following Works: - Profiling Of Ground Surfaces, - Filling Of Defects In Ground Surfaces With Stone Material, - Filling Of Defects In Ground Surfaces With Stone Material Along With Trenching, - Felling Of Roadsides, - Restoration Or Cleaning Of Ditches, - Filling And Strengthening Of Defects In Roadsides. Aggregate, - Strengthening The Roadsides With Crushed Aggregate And Making A River Bed, - Removing Silt On The Road, - Cleaning Watercourses, - Trimming Branches Using An Aerial Lift, - Removing Tree Stumps, - Cleaning Culverts Under Roads With A Diameter From Ø 400 To Ø 800, - Cleaning Street Wells, - Filling In Missing And Damaged Manholes And Sewage Grates, - Renovation Of Culverts Under Roads, - Height Regulation Of Culverts Under Exits, - Hardening Of Roadsides On Horizontal Curves Of Roads, - Repair Of Sidewalks (In Pit Places), - Replacement Of Curbs, - Strengthening (Replacement) Of Ditch Slopes With Eko Boards, - Renovation (Replacement) Of Prefabricated Concrete Sewage (Mulda Type).2. The List Of Works Planned To Be Performed Under The Order Is Provided In The Offer Cost Estimate Form, Which Is An Annex To The Swz (Form No. 2).3. As Part Of The Works Specified In The Offer Cost Estimate, It Is Necessary To: - Perform All Auxiliary And Accompanying Works That Are Necessary For The Proper Performance Of The Works Included In The Offer Cost Estimate By The Contractor, Including Works Resulting From The Technical Specifications And The Draft Contract, - Prepare, Approve And Implement The Traffic Organization Design For The Duration Of Individual Types Of Works.4. A Detailed Description Of The Subject Of The Contract Is Described In Volume Iii Of The Swz Description Of The Subject Of The Contract (Opz).5. Materials, Construction Products, Devices Necessary To Implement The Subject Of The Order: 1) Materials, Construction Products, Devices Necessary To Implement The Subject Of The Order, Including Those Provided For In The Design Documentation, Sst And Offer Cost Estimates, Are Provided By The Contractor, Unless Otherwise Indicated In The Order Documents. If The Design Documentation, Sst, And Offer Cost Estimates Indicate The Origin (Brand, Trademark, Manufacturer, Supplier) Of Materials, Construction Products, Devices, Source Or Specific Process That Characterizes Them - The Ordering Party Allows The Use Of Materials, Construction Products, And Equivalent Devices, Provided That They Guarantee Obtaining Technical Parameters That Are Not Worse (I.E. The Same Or Better) Than The Parameters Required In The Above-Mentioned Documents. The Use Of Materials, Construction Products And Equivalent Devices Requires The Approval Of The Employer Before Their Installation.2) The Materials Referred To In Point 1 Should Meet The Quality Requirements Specified In The Applicable Regulations On Construction Produ
|