|
Local Administration Of Work, Mobilization And Demobilization Of Work Considering 0.20% Of The Value Of The Work - Vila Braz, Mobilization And Demobilization Of Container, Including Loading, Unloading And Transport In A Comguindauto Body Truck (Munck), Exclusive Container Rental, Supply And Placement Of Work Sign On Galvanized Plate #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1, 25Mm, Including Autoclaved Eucalyptus Support Painted With Pva Paint Two (2) Coats, Rental Of Container With Thermal Insulation, Type 3, Storage Deposit/Construction Tooling, With Reference Measurements Of (6) Meters Length, (2, 3) Meters Width And (2, 5) Meters Internal Usable Height, Including Connections Internal Electrical, Exclusive Mobilization/Demobilization And External Temporary Connections, Loading, Maneuvering And Unloading Of Rubble In A 10 M³ Dump Truck - Loading With Hydraulic Excavator (Bucket 0.80 M³ / 111 Hp) And Free Unloading (Unit: M3). Af_07/2020, Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Horizontal Excavation, Including Loading And Unloading In 1St Category Soil With Crawler Tractor (100Hp/Blade: 2, 19M3). Spreading Material With Crawler Tractor. Af_09/2024, Regularization Of The Subgrade - Compacted In Normal Energy, Sub-Base Granulometrically Stabilized With Bicacorrita Crushed (Quarry Aggregate) - Intermediate Proctor, Transport With 14 M³ Dump Truck, Dmt Up To 30 Km (Unit: Txkm). Af_07/2020, Additional For Dmt Exceeding 30 Km (Unit:Txkm). Af_07/2020, Granulometrically Stabilized Base With Bicacorrie Crushed (Quarry Aggregate) - Modified Proctor, Priming With Asphalt Emulsion - Eai, Manual Cleaning, Connection Painting With Rr-1C, Transport With 30000 L Asphalt Material Transport Tank Truck, On Paved Urban Road, Dmt Up To 30Km (Unit: Txkm). Af_07/2020, Additional Paradmt Exceeding 30 Km (Unit: Txkm). Af_07/2020, Execution Of Pavement With Application Of Asphalt Concrete, Bearing Layer - Exclusive Cargo And Transport. Af_11/2019, Rental Of Water Or Sewage Network. Af_03/2024, Mechanized Excavation Of Trench With A Depth Of Up To 1.5 M(Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width From 0.8 M To 1.5 M, On 1Acategory Soil, Locations With Low Level Of Interference. Af_09/2024, Trench Shoring, Discontinuous Type, With Depth Of 1.5 M To 3.0 M, Width Less Than 1.5 M. Af_08/2020, Mechanized Piping At The Bottom Of The Trench With Vibration Plate, Excavation Exclusive, Lean Concrete For Tubular Network Cradle, Ratio 1:4, 5:4, 5, Mechanical Preparation With Concrete Mixer, Includes Launching And Finishing, Form For Cradle In Sawn Wood Board, 4Usements - Manufacturing, Assembly And Disassembly Ref96533, Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, Mechanized Trench Backfilling With Hydraulic Excavator (Bucket Capacity: 0.8 M³/Power: 111 Hp), Width 1.5A 2, Depth Up To 1, With Soil (Without Replacement) Of 1St Category, With Percussion Soil Compactor.Af_08/2023, Load Mechanics On Trucks, Reinforced Concrete Pipe For Rainwater, Class Pa-1, With P Fitting
|