|
Bids Are Invited For 2 Mega Pixel Network Outdoor IR PTZ Camera , 8 Channel Network Video Recorder , Workstation with Monitor For Remote Viewing , Layer 3 Managed Switch Primary and Redundant , Layer 2 8 Ports x 1G PoE Plus Plus Managed switch , 1G Single Mode SFP Transceiver Module , 1G Ethernet RJ45 SFP Transceiver Module , RF Link Point to MultiPoint radio with minimum 3 Km range with accessories , 24 Core Single Mode Armoured Optical Fiber Cable , 24 Port loaded Optical Fiber LIU , 6 Port loaded Optical Fiber LIU , Optical Fiber Patch Cord LC LC 3 Mtrs , Cat6 4 Pair Unshielded Twisted Pair Cable , Cat6 UTP Patch Cord 2 Mtr , Cat6A STP Patch Cord 2 Mtr , Cat6A STP Patch Cord 5 Mtr , Cat6A STP Patch Cord 15 Mtr , Cat6A STP Patch Cord 30 Mtr , Cat6 UTP Information Outlet , 27 U Floor Mount Rack with accessory , 17 U Floor Mount Rack with accessory , 6 U Pole Mount Rack with accessory , Galvanized Pole 12 Mtr Camera Mounting Poles for PTZ Camera , 5 KVA Online UPS in Parallel Redundancy mode with 60 minutes battery backup in each UPS , 4 Core 6 MM Armoured Copper Electrical Cable , Electrical Box with 25 Amp MCB , 2 x 15 or 16 Amp Shuttered switch socket Combined with Cover Plate and back box at Control Room End , DB with 1 x 40 Amp DP and 4 Nos SP 25 AMP MCB For UPS End , DB with 1 x 40 Amp DP and 2 Nos SP 25 AMP MCB For UPS End , DB with 1 x 40 Amp DP , 40MM dia HDPE pipe with all fixing accessories for Outdoor installation , 25MM PVC Pipe with all fixing accessories for Indoor , 25MM PVC Flexible Pipe for Indoor , 25 or 32mm PVC Reinforceable flexible Pipe , Supply Installation Testing and Commissioning of earthing with copper earth plate , Supply Installation Testing and Commissioning of 25 mm x 5 mm copper strip at 0.50 Meter below ground as strip earth electrode , Supply Installation Testing and Commissioning of 4mm Dia copper wire Supply Installation Testing and Commissioning of providing joints by using brazing technique , Supply Installation Testing and Commissioning of copper bonded rod with low carbon steel high tensile strength copper bonded rod with min 254 microns of copper plating , Excavation of soil for making trench , Laying or fixing of HDPE Conduit or pipe Underground or surface complete as required as per site condition , Laying of 25MM PVC Pipe , Laying of 25MM PVC Flexible Pipe for Indoor complete as required , Laying of 25 or 32mm PVC Reinforceable flexible Pipe complete as required , Laying of Optical Fiber Cable end to end ferruling labeling and termination through GI Conduit or PVC Pipe complete as required , Laying of Cat6 UTP end to end ferruling labeling and termination through PVC Pipe complete as required , Laying of Electrical Cable end to end ferruling labeling and termination through GI Conduit or PVC Pipe complete as required , Mounting and Fixing of GI Pole after excavation of soft or hard soil including cutting of bituminous road or pavement , Mounting Fixing Labeling and Dressing of Floor Standing Rack complete as required , Mounting Fixing Labeling and Dressing of 6U Pole Mount Rack complete as required , Mounting Fixing and Labeling of All Types of Cameras complete as required , Installation Splicing of all OFC core Rack to Server Rack Labelling testing and commissioning , Installation of DB , Installation of 2 x 15- or 16- Amp Shuttered switch socket Combined with Cover Plate and back box For Surveillance Room End , Installation of Electrical Box with 25 Amp MCB 15 or 16 Amp Socket at Rack End , Installation Testing and Commissioning of 5KVA Online UPS with 60 Min Backup including UPS output Electrification complete as required , Installation Testing and Commissioning of NVR Primary and Redundancy complete as required , Termination and Fixing of Category 6 UTP Information Outlet , Mounting Fixing Installation and Configuration of All Types of Switches complete as required , Installation and Configuration of WorkStation complete as required , Installation and Configuration of Point to MultiPoint radio with accessories complete as required , Testing commissioning certification providing 3 sets of completion diagram and Documentation of Entire Project Total Quantity : 14787
|