|
Construction Work For Water Projects – Flood Peak Reduction Reservoir Construction In Gödreszentmárton. Construction Of A Hilly Reservoir In Gödre, On The Border Of Baranyajenő Village, In The Section Above The Valley Closure Dam Planned For The 8+150 Km Section Of The Gödrei Watercourse. The Reservoir Can Be Realized With A Significant Storm Storage Capacity, Its Storage Capacity At Flood Water Level Is 601,819.6 M3. It Ensures The Containment Of Floods Coming From The Gödrei Watercourse. The Design Of The Reservoir With A Constant Water Level Enables Its Complex Usability (Flood Peak Reduction, Water Retention, Water Storage, Welfare Utilization, Agricultural Utilization). The Planned Interventions: - ~375 M Valley Closure Dam Construction: Construction Of An Earth Dam From Local Materials - ~1024 M Long Embankment Construction: Construction Of An Aquifer Embankment From Local Materials - Construction Of A Pipe Sluice In The Longitudinal Embankment - Construction Of 1 Water Level Retaining And Draining Structure (Central Structure): Construction Of A Combined Function Flood Level Control Structure With A Reinforced Concrete Structure, Steel Blocking And Moving Equipment, Passive With The Possibility Of Closure, An Access Bridge And Other Additional Facilities - Construction Of 1 Piece Of Vészáraspásť Artefact And Related Tidal Channel: The Articl Is Made With A Stone Cover Laid In Concrete Between The Reinforced Concrete Sealing Teeth, The Fore And Aft Part Of The Artefact, As Well As On The Tidal Channel, A Bed Protection Made Of Reno Mats And Gabion Baskets Is Made Arrangement, Landscaping - Other, Ancillary Works: Construction Of Belt Ditches, Arrangement Of A Maintenance Lane, Construction Of An Approach Road (Exit), Security Of Public Utilities - Hydrographic And Other Facilities Are Necessary For The Operation Of A Reservoir: Hydrographic Station, Profile Stones, Placement Of Stones, Barriers, Guidance And Prohibition Signs Planning And Licensing Tasks: • Preliminary Tests And Measurements Necessary For Planning, • Preparation Of Construction Plans, • Preparation Of Implementation Plans, Preparation And Approval Of Land Development Plans • Plans Related To Obtaining An Operating Permit, Preparation Of Permit Documentation, Operating Regulations, Management And Maintenance Manual, • Archaeological Documentation (Depending On The Erd, Erd I. And/Or Erd Ii.), • Preparation Of All Other Plans And Acquisition Of Permits Required By Legislation Or Authority To Start And Carry Out Work. - Preparing A Recycling Plan - Examining Compliance With The Dnah Principle And Taking It Into Account Is The Contractors Task, And During The Implementation, The Contractor Checks And Validates The Implementation Of The Interventions To Be Implemented In Accordance With The Dnah Principle In Accordance With The Requirements Of The Relevant Call Kehop Plusz--1.2.21 Identification Number. The Dnah Principles For This Investment Are As Follows: - Nature-Based Solutions And Minimization Of Energy Demand (In Part) - Exploration And Consideration Of Ecological Needs - Use Of Native Species - Green Public Procurement (In Part) - Preparation Of A Recycling Plan. The Task Of The Winning Tenderer - Including The Preparation Of Construction And Realization Plans - Is The 191/
|