1. The Subject Of The Order Is A Comprehensive Renovation Of Rooms With Elements Of Modernization Of The Building Of The Village Community Center In Liciążna. Connecting Both Meeting Rooms By Making An Opening In The Wall Between These Rooms, Installing A Movable And Foldable Wall, Modernizing The Central Heating System By Installing An Air-Water Heat Pump And Installing Underfloor Heating, Replacing Existing Ineffective Lighting Fixtures, Renovating The Rooms By Replacing Floors, Doors, Window Sills, Local Repair And Painting Of Walls, Adapting The Entrance To The Building To The Needs Of Disabled People By Installing A Ramp For People In Wheelchairs.2. Detailed Scope Of Works: 2.1. Demolition Works Inside The Building (Dismantling Floor Layers, Dismantling Doors, Dismantling Furnaces, Removal And Disposal Of Rubble).2.2. Installation Of A Partition Wall And Execution Of Accompanying Works (Cutting A Hole, Making Foundations, Reinforced Concrete And Steel Structures, Replenishing Plasters, Delivery And Installation Of A Mobile Wall)2.3. Construction Of Floors (Installation Of Base Layers, Moisture-Proof And Thermal Insulation Layers, Cement Floor And Laying Of Ceramic Tiles With Plinths).2.4. Finishing Works On The Ground Floor (Installation Of A Lintel Beam, Installation Of Window Vents, Replacement Of Internal Doors, Painting Of Walls And Ceilings, Construction Of A Ramp For The Disabled, Checking And Cleaning Of Ventilation Ducts).2.5. Construction Of A Central Heating Installation (Delivery And Installation Of Complete Boiler Room Equipment, Including An Air-Water Heat Pump, Construction/Installation Of Pipelines, Manifolds, Central Unit, Thermostats, Actuators, Valves, Pumps, Performance Of Tightness Tests).2.6. Replacing Lighting Fixtures.2.7. Other Works, Devices, Elements Not Listed And Unforeseen But Necessary For The Proper Implementation Of A Fully Functioning Investment Object.3. The Remaining Description Of The Subject Of The Order Is Included In Chapter 4 Of Swz.4. A Detailed Description And Scope Of The Subject Of The Order Is Included In The Design Documentation: Construction Design, Bill Of Quantities, Certificates Of No Grounds For Objection Regarding The Intention To Perform Construction Works And Stwiorb Constituting Annexes To This Swz.
|