Type Of Service Sealing Of The Coupling Joint. The Bridge Was Built In 1970-1971. It Is A Seven-Span Prestressed Concrete Bridge With Two Main Girders Of Bridge Class 60 According To Din 1072. The Bridge Is Longitudinally And Transversely Prestressed. The Existing Coupling Joint In Axis C-D Has A 100% Joint As Is Usual In Construction At This Time. The Resulting Possible Causes Lead To A Leak. As An Initial Measure, The Obviously Damaged Bridge Sealing In This Area (W/L = 8M X 12.70M) Should Be Replaced. The Advertised Concrete Maintenance Work Refers To The Direct Construction Site (Top Of The Panel) In The Area Of The Sealing Work. For The Duration Of The Measure (4 Weeks), A Programmed Lsa System Must Be Set Up, Maintained And Implemented At Least Once In Accordance With The Bii / 6 Rule Plan, Including Site Power Distribution (See Appendix For Connection). The Bridge Leads Over A Db Route.
Contact Information
Contact Person
Elke Dammann
Address
Werner-Bock-Str. 38
Contact No.
+495215186865
Email
elke.dammann@bielefeld.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108860070
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.