Part 1: Reconstruction Of The Surface Of Municipal Roads By Laying Yomb Boards - District No. 11. The Subject Of The Order Includes The Reconstruction Of The Surface Of Municipal Roads: 1) Będźmierowice - Laying Yomb Slabs From The Asphalt Road In The Center Of Będźmierowice To Dk22 (83 M X 4 M = 332 M2)2) Gotelp - Laying Yomb Slabs Towards Stara Juńcza (121 M X 4 M = 484 M2)3) Gutowiec - Laying Yomb Slabs In Ul. Krętej In Gutowiec - 50 M And Stage I In Kurków - 75 M (125 M X 4 M = 500 M2)4) Lipki - Laying Yomb Boards In Ul. Leśna In Wądoły Towards Dk22 (146 M X 4 M = 584 M2)5) Łąg - Kolonia - Laying Yomb Boards In Szałamaje - Continuation (58 M X 4 M = 232 M2)6) Łubna - Laying Yomb Boards In Łubna - Continuation (173 M X 4 M = 692 M2)7) Łukowo - Laying Yomb Boards In Łukowo (94 M X 4 M = 376 M2)8) Malachin - Laying Yomb Boards In Ul. Słoneczna - 166 M And Ul. Cegielniana In Malachin - 42 M (208 M X 4 M = 832 M2)9) Wet - Laying Yomb Slabs In Rówki - Continuation (83 M X 4 M = 332 M2)10) Mosna - Laying Yomb Slabs In Mosna (48 M X 4 M = 168 M2)11) Odry - Laying Yomb Slabs In Odry:A) Street Selected Pod Miedzno - 50 M B) Ul. Kręta - 57 M (107 M X 4 M = 428 M2)12) Wieck - Laying Yomb Boards In Zawada (38 M X 4 M = 152 M2)13) Zapadowo - Laying Yomb Boards Towards Nowy Młyn - Continuation (104 M X 4 M = 416 M2)2. Scope Of Works: 1) Surveying Services. 2) Road Trenching. 3) Laying Yomb Slabs On A Gravel Ballast With A Thickness Of 10 Cm (Drainage Layer) Along With Silting Up The Holes.4) Profiling And Compacting The Roadsides.5) Adjusting Manhole Covers, Gate Valves, Etc. Note. The Cross-Section Should Be Made In Accordance With The Attached Drawing. Fig. 1 Road Made Of Yomb Boards - Normal Cross-Section. In Justified Cases, It Is Allowed To Change The Transverse Slope Of The Surface Made Of Yomb Boards To One-Sided, And To Change The Transverse Slope Of The Roadside. Each Such Case Will Be Considered By The Ordering Party And The Investor Supervision Inspector Individually And Consent To The Above Will Be Granted To The Contractor. Change. Attention. The Roadsides Should Be 0.75 M Wide; The Width Of The Roadsides May Be Changed To Less Than 0.75 M In Justified Cases. Each Such Case Will Be Considered By The Ordering Party And The Investor Supervision Inspector Individually And Consent To The Above Will Be Granted To The Contractor. Change.The Area Adjacent To The Roadsides Should Be Profiled And Tidied Up.3. Before Starting The Works, The Contractor Will Develop A Traffic Organization Plan For The Duration Of The Works, Which Will Be Approved By The Relevant Authorities And The Road Manager.4. Before Starting The Works, The Contractor Will Agree With Zuk Sp. Z O. O. In Czersk, Location Of Wells And Valves Of The Water And Sewage Network. In Order To Adjust Them, And On The Day Of Final Acceptance, It Will Present A Report Confirming The Correctness Of The Adjustment Of These Wells And Valves, Issued By Zuk. Sp. Z O. O. In Czersk.5. When Adjusting Cast
Contact Information
Address
Gmina Czersk,Czersk,89-650,Pomorskie,Pl637 - Chojnicki
Contact No.
523954810
Email
urzad_miejski@czersk.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108802778
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.