Engineering Services – Structural Improvement Expansion Of The Garmisch-Partenkirchen Clinic - Specialist Planning Technical Equipment Hlsk Lph 5 – 9. Structural Improvement Expansion Of The Garmisch-Partenkirchen Clinic - Specialist Planning Technical Equipment Hlsk Lph 5 - 9 // The Garmisch-Partenkirchen Clinic Intends To Improve The Structure And Expand The Existing Clinic Building As Part Of The 8Th Construction Phase On The Auenstrasse 6 Property. For This Purpose, Existing Technical Systems In Existing Buildings Outside The Main Building, In The Area Of The New Building As Well As In Supply And Connecting Corridors Are To Be Dismantled, Relocated And Rebuilt In Order To Meet The Requirements To Ensure Building Technology, Hygiene And Ongoing Hospital Operations. The Scope Of Services Includes The Clearing Of The Construction Site, Dismantling, Relocation And Conversion Work On Existing Supply And Disposal Systems, The Relocation Of The Non-Public Wastewater And Rainwater Sewer As Well As The Main Water Pipe, The Construction Of The New Building In The 8Th Construction Phase, Renovation And Conversion Measures In The Main Building As Well As Measures To Maintain Hospital Operations Including Dismantling The Temporary Structures After Completion Of The Construction Work. The Technical Areas For Heating, Ventilation, Plumbing And Cooling Are Located On The 2Nd Basement Floor And In A Newly Built Technical Center And Supply The New Building Sections From The 1St Basement To The 3Rd Floor. The Design Allows For A Later Addition Up To The 6Th Floor; For This Purpose, Dirty Water Routes And Riser Shafts Are Dimensioned Accordingly. Heating, Cooling, Drinking Water And Medical Gases Are Supplied From The Second Basement Floor. Ventilation Systems For A Possible Extension Are Planned On The Roof Of The 6Th Floor. Since The Clinics Existing Heat Supply Is Based On Fossil Fuels And Does Not Have Sufficient Power Reserves, A Renewable Energy Supply Is Planned For The New Building. This Is Done Via Nh3 Heat Pumps And Nh3 Refrigeration Systems Using Heat Recovery, Waste Heat From Kitchen Exhaust Air, Transformer Systems And The Existing Combined Heat And Power Plant As Well As Free Coolers For Energy Production, Delivery And Free Cooling. -- The Subject Of The Order Is The Services Of Specialist Planning For Technical Equipment Hlsk Lph 5 - 9 According To Hoai 2021. The Commission Is Carried Out In Stages In Accordance With Section 55 Hoai. In The Event Of An Order, Stage 1, Service Phases 5, 6 And 7 Are Commissioned As The First. The Client Will Decide Whether To Commission Additional Service Levels As The Process Progresses. No Demands For The Transfer Of Further Service Levels Or Additional Services Can Be Derived From The Gradual Commissioning. -- Planning Should Begin Shortly After The Order Is Placed, Probably In May 2026. Construction Of Ba8 Is Scheduled To Begin In November 2027, And Commissioning Is Planned For February 2031 - The Special Services Are Designed As Options That The Client Can Call Up, But Which They Are Not Obliged To Call Up. -- The Ve
Contact Information
Contact No.
0 88 2177 1160
Email
stefan.hardt@klinikum-gap.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108716163
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.