|
Removal And Removal Of Tree Remnants, Including Transport With Removal Of Removed Material (In A Bucket), Ed-28429- Supply And Placement Of Work Sign In Galvanized Sheet 26, Esp. 0.45Mm, Dimension (6 1, 25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two (2) Coats, 2.1 Rental Of Container With Thermal Insulation, Type 2, For Construction Office With Bathroom Containing One (1) Toilet And One (1) Washbasin, With Reference Measurements Of (6) Meters Length, (2, 3) Meters Width And (2, 5) Meters Internal Useful Height, Including Air Conditioning And Internal Electrical And Hydrosanitary Connections, Excluding Mobilization/Demobilization And External Temporary Connections, Item 1.3.2 - Temporary Connections For Type 2 Container (Corresponding To Ed Code 16349), 1.2. Rental Of Thermally Insulated Container, Type 3, For Warehouse/Construction Tooling, Including Internal Electrical Connections, 02/06/2026 - 07:41:19, 02/06/2026 - 07:45:57, 02/06/2026 - 07:46:13, 2.4 Connections Temporary For Type 3 Container (Corresponding To Ed Code 16350), Item 1.2.3 - Sewer Connection To Construction Shed On Site, Excluding Septic Tank, 1.3.5 Mobilization And Demobilization Of Container, Including Loading, Unloading And Transportation In Truck Body With Crane (Munck), Exclusive Container Rental, Item 2.7 - Rental Of Work With Template Of Boards Pointed Every 2.00M, Reuse (2X), Including Monitoring Of Topographic Team To Mark Topographic Point, Ed-50159 Fixed Protective Siding For Enclosing Work In Plywood Sheet, Esp. 12Mm, With Module Size Of (110X220) Cm, Including Latex Paint (Pva) With Two (2) Coats, Exclusive Of Opening For Gates, Regularization And Compaction Of Predominantly Clay Soil Screed For Floor Construction Works - Sinapi 100576, Block Frame, Insulated Footing, Baldrame Beam And Running Shoe Using 8 M Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, 3.1.4. Block Frame, Baldrame Beam And Running Shoe Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 16 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024 Sinapi 104916, Manual Excavation For Crowning Block Or Footing (Including Excavation For Placement Of Formwork), 3.1.10 Mechanized Compaction Of Backfill With Vibrating Plate, Including Manual Spreading, Manufacturing, Assembly And Disassembly Of Formwork For Footing, In Resin Plywood Sheet, E17 Mm, 4 Uses. Af_01/2024, 3.1.15 Supply Of Structural Concrete, Machined And Pumped, With Fck 30Mpa, Including Laying, Compacting And Finishing (Foundation), 3.1.1 Manual Excavation Of Trenches With A Depth Of Less Than Or Equal To 1.5M, Including Lateral Discharge, Lean Concrete Ballast, Applied In Floors, Slabs On The Ground Or Radiators, 3 Cm Thick. Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, Insulated Footing Frame, Baldrame Beam And Running Shoe Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024Insulated Shoe Frame, Baldrame Beam And Running Shoe Using Ca-50 Steel
|