|
Elaboration Of An Executive Architecture And Landscaping Project, Elaboration Of An Executive Structure Project, Elaboration Of An Executive Facilities Project: Hydrosanitary, Electrical, Fire Prevention And Fighting, Spda, Air Conditioning, Drainage, Lighting And Lpg Gases, Manual Removal Of Grids, Fences, Gates, Doors, Windows, Crockery, Appliances And Countertops, Demolition Of Masonry, Slabs, Simple And Reinforced Concrete, Floors, Coatings, Partitions, Plinths, Sills, 05/02/2026 - 11:12:24, 05/02/2026 - 11:12:27, 05/02/2026 - 11:12:28, 05/02/2026 - 11:12:29, Cleaning Of External Area, Including Removal Of Trees, Removal Of Rubble Arising From The Execution Of Work, Including Unloading In Licensed Area, Location Of Work, Cleaning, Removal Of Surface Dirt, Waterproofing Of Surfaces, Plates, Sidings And Temporary Connections, Installation Of Sheds, Rental Of Container And Scaffolding, Including Mobilization/Demobilization And Assembly, Construction Of A Structural Wall To Contain The External Patio Area (Mc 01), Including Earth Moving And Booting, Cleaning Of Reinforced Concrete Structure (Pier And Building) With High Pressure Jet, Scarification, Manual Concrete Peaking, Sanding And Removal Of Corroded Reinforcement, Recovery Of Reinforced Concrete With Reinforcement Reinforcement, Grouting And Shaping, Treatment Of Structural Joints, Cracks And Fissures, Installation Of Shapfts And Partitions In Bathrooms, Closing Of Openings, Elevation Of Masonry, Including Opening And Closing Of Slits For Installations, Tempered Glass Doors, Wooden Sliding Doors, Wooden Opening Doors And Glass, Wooden Opening Doors, Aluminum Opening Doors, Wooden And Glass Tilting Windows, Fixed And Fixed + Tilting Windows In Wood And Glass, Sash Windows, Asphalt Blanket, Waterproofing Paint And Mechanical Protection, Visit Closing And Duct Closing, Plaster Lowering Including Painting, Plastering And Painting Of Ceilings, Plastering And Plastering On Internal Walls, Plastering And Plastering On External Walls, Ceramic Finishes And Roda Half In Service Area, Accessible Sanitary, Female And Male, Including Plaster, Painting On Internal Walls, Painting On External Walls, Including Repair Of Knifes, Painting On Frames And Wooden Elements, Flooring In Polished High-Resistance Mortar, Including Skirting Boards Environments: Service Area, Male/Female And Service, Including Baseboard In Rooms: Multipurpose Space 1 And 3, Internal Circulation And Hall, Floor In High-Resistance Anti-Slip Mortar, Room: Pier And Balconies (1 And 2), Floor In Red Capao Bonito And Siena White Granite, Including Baseboard In Rooms: Multipurpose Space (1, 2, 4, 5, 6 And 7), Hydraulic Tile Floor 20X20cm, In Environments: Service And Accessible Sanitary, Cemented Floor, Including Regularization And Painting, Environment: Deposit And Gas Plant, Floor Interlocked With Rectangular Concrete Block, Thickness 6Cm, Natural Color And Red, Settled On Sand Mattress And Grouting, Including Ballast, Walkway With Coating In Corumba Gray Sawn Granite, 3Cm Thick, Applied Over Concrete Ballast, Including Curbs, Flooring In Itaunas White Granite Over Concrete Ballast, Pastillated And Grooved Hydraulic Tile For Tactile/Directional Alert, Cold Water Installations: Inlet Standard, Pipes, Connections And Registers, Sewage Installations: Boxes Inspection/Sinonads, Tubes And Connections, Crockery: Sanitary Basins, Washbasins And
|