|
The Subject Of The Order Is The Performance Of Construction Works As Part Of The Investment Task Entitled: Reconstruction Of District Road No. 2427L In The Bełżyce Commune. The Investment Is Located In The Lublin Voivodeship, In The Lublin Poviat, In The Bełżyce Commune. City Of Plot No. 060901_4.0004.1054/2, 060901_4.0004.1041 Bełżyce-Centrum Precinct And The Bełżyce Commune, Plot No. 060901_5.0005.390 Jaroszewice Precinct, Plot No. 060901_5.0001.1407 Babin Precinct. The Starting Point Of The Rebuilt District Road Is Located At The Connection To The Single-Lane Roundabout Under Construction - The Intersection Of Ul. Wojska Polskiego From Ul. Fabryczna In Bełżyce. The End Of The Route Is Located On The Administrative Border Of The Bełżyce Commune And The Niedrzwica Duża Commune. The Total Length Of The District Road Section Is Approximately 4,992 M. The Scope Of Works Includes: In The Road Industry: • Reconstruction Of Drainage Devices Located In The Road Lane: Extension Of Culverts Under The Road Crown, • Reconstruction Of Culverts Under Exits And Municipal Or Internal Roads, • Reconstruction Of Roadside Ditches, • Reinforcement Of Ditches And Covered Ditches, • Construction Of Street Inlets And Construction Of Outlets To Ditches, • Construction Of Sewage Systems Concrete, • Reconstruction Of The Existing Road Surface, • Reconstruction Of Intersections With Existing Roads, • Renovation, Reconstruction Of Existing Exits, • Construction Of Bus Bays, Construction Of Pedestrian Platforms, • Construction Of A Road For Pedestrians And Bicycles And A Pedestrian Road Within Bus Bays, • Strengthening The Roadsides With An Aggregate Mix, • Setting Up Road Traffic Safety Devices: Guide Boards, Guide Posts, Balustrades, Protective Barriers, • Introduction And Maintenance Of Temporary Traffic Organization Ensuring Communication Patency,• Securing The Following Networks: Power And Telecommunication Networks, Water Supply Networks, Gas Pipeline Networks, Sewage Networks. In The Telecommunications Industry• Construction Of A Technological Channel, Including: Construction Of A Ktu Street Channel - 4952.0 M, Construction Of A Ktp Culvert Channel - 95.0 M, Construction Of Sk-2 Cable Chambers - 4 Pcs. Construction Of Skr-1 Cable Chambers - 51 Pcs. In The Sanitary Industry• Construction Of A Storm Drainage System,• Reconstruction Of Sections Of The Existing Gas Pipeline To Ensure Proper Coverage. In The Electricity Industry• Construction Of Road Lighting,• Removal Of Conflicts With The Pge Dystrybucja S.A. Network. Note: Based On The Financial Plan Of The District Road Authority In Lublin Based In Bełżyce, Two Payments Are Planned For The Task In 2026 - 20% And 30% And One Payment In 2027 In The Amount Of 50% After Final Acceptance, Which Should Be Reflected In The Material And Financial Schedule.
|