1. Demolition Works (Removal Of Wall Coverings, Plug-In Cables, Installation Connectors And Plug Sockets, Removal Of Door Frames) - (We Do Not Include The 3 Deleted Items From The Bill Of Quantities In The Calculation).2. Renovation Works (Covering The Ceiling With Patches, Making Thermal And Anti-Sound Insulation With Wool, Insulating With Polyethylene Foil, Making Plasterboard Cladding, Making Lighting And Socket Installations, Installing Connectors And Boxes, Filling In Plasters, Bricking Up Brick Walls, Making Arches Over Openings, Filling In Brick Walls, Wiping Existing Internal Plasters And Scraping Off Paint On The Walls, Applying Plaster - 2 Layers, Painting With Emulsion Paints Twice With Priming, Drilling Holes, Plastering The Reveals, Inserting A Window, Inserting Internal Wooden Doors (Cpl Veneer) - 2 Pcs. 90 Cm With Processing. Dismantling The Window Next To The Toilet, Breaking Down The Wall Under The Removed Window, Installing External Aluminum Doors (Warm) With Top Lighting, Double-Leaf With A Movable White Mullion, Safety Glass On Both Sides, Equipped With A Door Closer And Two Locks, Including Plastering And Painting. Opening Dimensions: Approx. 205 X 326 Cm. Thermal Transfer Coefficient Not Worse Than 1.3 W/(M2 K). Renovation Works - Floor Construction (Making A Base For Sand Floors, Making A Base For C 8/10 Concrete Floors, Thermal And Moisture Insulation, Leveling Layer For Steel Mesh Floors 5 Cm Thick, Tile Floors Laid With Glue 60X60 Cm, Plinth Made Of Cut 10 Cm Tiles, Making A Stage Floor From Mechanically Sanded And Twice-Varnished Boards.4. Heating A Large Room By Installing A Gas Heater On A Rotating Console Mounted On The Wall With A Power Of At Least 20 Kw + Wall Controller, Including A Gas Installation And Installation Of A Stainless Steel Exhaust Chimney (Vertical Installation). Heat Exchanger And Gas Burner In The Heater Made Of Low-Carbon Stainless Steel. 20 Kw Condensing And Stainless Steel Flue Chimney (For Vertical And Horizontal Installation, Use A Press Type Clamping Steel Pipe System - The Distribution Of The Central Heating Installation Is Attached In Annex No. 9 - Individual Calculation). Aluminum Radiators - Supplied By The Investor, Rinsing Required Before Installation (Radiators After Dismantling). 5. Transferring The Water Meter From The Manhole To The Building (Kitchen Or Toilet) – Own Calculation
|