|
The Subject Of The Order Is The Design And Execution Of Construction Works Related To The Reconstruction Of The Bus Bay At Ratuszowa Street In Baborów, Together With The Accompanying Infrastructure, And The Construction Of A Bus Bay At Wiejska Street In Baborów, Together With The Accompanying Infrastructure. The Following Tasks Are Expected To Be Performed As Part Of The Subject Of The Order: Task 1: Reconstruction Of The Bus Bay At Ratuszowa Street In Baborów. Task 2: Construction Of A Pedestrian Route And A Bicycle Shelter At The Rebuilt Bus Bay At Ratuszowa Street In Baborów. Task 3: Construction Of The Bus Bay At Wiejska Street In Baborów. Task 4: Construction Of A Sidewalk And A Pedestrian Crossing And A Bicycle Shelter At The Constructed Bay. Autobusowa At Wiejska Street In Baborów. As Part Of The Reconstruction Of The Bus Bay At Ratuszowa Street In Baborów, Together With The Accompanying Infrastructure, The Following Should Be Performed: - Preparatory And Demolition Works, - Earthworks, - Lighting Of The Bus Bay Area, - Rainwater Channel With Elements (Inspection Wells, Sewage Wells), - Bed For The Construction Layers Of The Road And Under The Sidewalk, - Reinforcement Of The Subsoil, - Development Of Curbs, - Construction Layers Foundation, - Road Surface Of The Bus Bay Made Of Asphalt Concrete, - Surface Of Sidewalks, Entrances And Exits Made Of Granite Elements, - Installation Of Devices And Equipment For The Bus Bay, Including The Construction Of A Bus Shelter With A Section Separated For Cyclists, - Building Of A Modular Automatic Public Toilet. - Vertical And Horizontal Markings Along With Road Traffic Safety Elements. As Part Of The Construction Of The Bay At Ul. Wiejska In Baborowo, Together With The Accompanying Infrastructure, Should Include: - Preparatory And Demolition Works, - Earthworks, - Lighting Of The Bus Bay Area, - Lighting Of The Pedestrian Crossing, - Rain Canal With Elements (Inspection Wells, Sewage Wells), - Bed For The Structural Layers Of The Road And Under The Sidewalk, - Reinforcement Of The Subsoil, - Development Of Curbs, - Structural Layers Of The Foundation, - Surface. Bus Bay Roadway Made Of Asphalt Concrete And Concrete Surface, - Surface Of Sidewalks, Entrances And Exits Made Of Concrete Paving Stones, - Installation Of Bus Bay Devices And Equipment, - Vertical And Horizontal Markings Along With Road Traffic Safety Elements. The Subject Of The Order Includes The Following Basic Works: 1) Development Of Design Documentation Based On The Functional And Utility Program Owned By The Ordering Party, Including: A) Land Development Design, B) Full-Discipline Design Architectural And Construction Works To The Extent Necessary To Obtain A Building Permit/Notification Of Works, C) Development Of A Full-Discipline Technical Design To The Extent Necessary To Perform Construction Works, D) Preparation Of Bills Of Quantities, E) Preparation Of Detailed Cost Estimates, F) Preparation Of Technical Specifications For The
|