Tenders Are Invited For Construction Work - Adaptation To Climate Change Through The Development Of Green An ... in Poland
Tender Notice
TenderID
108404571
Tender Brief
Tenders Are Invited For Construction Work - Adaptation To Climate Change Through The Development Of Green And Blue Infrastructure In The City Of Stalowa Wola In The Scope Of The Investment Task, Part Viii Entitled Construction Of An Open Retention Reservoir At Ul. Przemysłowa Boczna
Construction Work - Adaptation To Climate Change Through The Development Of Green And Blue Infrastructure In The City Of Stalowa Wola In The Scope Of The Investment Task, Part Viii Entitled Construction Of An Open Retention Reservoir At Ul. Przemysłowa Boczna. 1. The Subject Of The Order Is The Design And Construction Of A Tight Retention Reservoir With A Total Capacity Of Approx. 1,770 M3 Along With Accompanying Infrastructure Within The Scope Of The Investment Task, Part Viii Entitled Adaptation To Climate Change Through The Development Of Green And Blue Infrastructure In The City Of Stalowa Wola In The Scope Of The Investment Titled Construction Of An Open Retention Reservoir At Przemysłowa Boczna Street As Part Of Project Funding: Task Co-Financed Under The Program: European Funds For Eastern Poland 2021-2027, Priority Fepw.02 Energy And Climate, Measure: Fepw.02.02 Adaptation To Climate Change, Project Type: I 2. As Part Of The Investment Task Entitled Adaptation To Climate Change Through The Development Of Green And Blue Infrastructure In The City Of Stalowa Wola In The Scope Of The Investment Titled Construction Of An Open Retention Reservoir At Przemysłowa Boczna Street Includes The Following Elements: 1) Reconstruction, Liquidation Or Protection Of Existing Technical Infrastructure (Utilities Network, Connections) Colliding With The Planned Investment, 2) Access Road - Service Road From Przemysłowa Boczna Street To The Reservoir Within Plots 966/20, 966/28, 966/34, 966/39, 966/45, 1456, With A Road Width Of 4.0 M And A Length Of Approx. 120 M, 3) A Tight Retention Tank With A Total Capacity Of Approx. 1,770 M3 And A Usable Capacity Of Approx. 947 M3, Including: A Service Road Leading To The Bottom Of The Tank Within The Plot 966/58, Installation Of A Suction Port, 4) A Well On The Collector Dn1100 And Reconstruction Of The Existing Chamber On The Dn1100 Collector, 5) Supply And Discharge Pipelines From The Tank, Including Installation Of A Flow Regulator, Devices Increasing Safety - Limiting The Inflow, 6) Delivery And Installation Of Pre-Treatment Elements (Separators), Including The Construction Of A Service Road Guaranteeing Access To The Separators Within The Plot 966/58, 7) System Fencing Of The Tank Made Of A 3D Panel With 1.43 M High And Approx. 190 M Long, System Gate And 2 Wickets, 8) Area Lighting (3 Sets Of Lanterns) With Power Supply From The Existing Lighting In The Street. Przemysłowa Boczna, 9) Area Monitoring (3 Camera Points) With Telecommunication Sewage And Fiber Optic Connection, 10) Information Board And Teaching Board. The Remaining Description Of The Subject Of The Order Can Be Found In The Order Documents.
Contact Information
Contact No.
+48158194710
Email
zp@stalowawola.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108404571
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.