1. The Subject Of The Order Is The Implementation Of The Investment Project Entitled: Expansion Of Dp 4339E With The Demolition And Construction Of The Bridge - Ul. Legionów In Tomaszów Mazowiecki.2. The Scope Of Works And Activities For The Entire Construction Project And The Sequence Of Implementation Of Individual Objects Includes In Particular: A) In The Scope Of Road Expansion In The Following Order: - Preparatory Works - Marking Out The Geometric Layout, Division Of Real Estate, - Demolition Of The Existing Road Surface, - Demolition Of Exits, - Reconstruction Of The Gas Pipeline, - Placing Stone Curbs On A Concrete Footing With Resistance, - Execution Of Structural Elements Of The Surface On The Expanded Section, - Construction Of Sidewalks And Routes Bicycle Paths, - Construction Of Roadsides, - Traffic Management Works, - Strengthening Of Road Slopes, - Construction Of A Technological Channel, - Reconstruction Of Rainwater Drainage, - Reconstruction Of The Power Grid, - Reconstruction Of The Telecommunications Network. B) In The Scope Of Construction Of The Bridge Over The Wolbórka River: - Demolition Of The Existing Bridge, - Construction Of Working Chambers From Sheet Piling Walls In The Outline Of The Bridge Abutments And Pillars, - Construction Of Drilled Piles With Injection Of The Pile Base, - Execution Foundation Footings, - Construction Of Pillars, Abutments And Wings, - Arrangement Of Bearings, - Drainage Behind The Abutments And Transition Slabs, - Pulling Out Sheet Pilings, - Construction Of Transition Slabs, - Construction Of Filters To Drain The Insulation And Inlets, - Waterproofing Of The Span And Transition Slabs, - Installation Of Anchored Granite Curbs, - Installation Of A Slip Layer Of Roofing Felt Under The Overhangs, - Construction Of Facades From Boards Cornices Made Of Polymer Concrete, - Installation Of Protective Pipes In Sidewalk Overhangs, - Execution Of Sidewalk Overhangs, - Drainage On The Span, - Execution Of Structural Layers Of Pavement On Access Roads And On The Bridge, - Construction Of Protective Barriers, - Strengthening Of The River Bed, - Construction Of Slope Drains, - Strengthening Of Cones With Concrete Elements, - Construction Of Slope Stairs, - Anti-Corrosion Protection Of Exposed Concrete Surfaces, - Construction Of A Technological Channel, - Execution Of Markings Horizontal, - Securing The Existing Technical Infrastructure, - Performing A Static And Dynamic Load Test. The Contractor Is Not Developing A Traffic Organization Project Because The Facility Has Been Temporarily Closed And The Detour Has Been Designated By The District Roads Authority In Tomaszów Mazowiecki. Within The Scope Of The Order, The Contractor Is Obliged To Make And Set Up Two Information Boards In Accordance With The Dimensions And Content Indicated In The Manual Of The Applicant And Beneficiary Of European Funds For 2021-2027. Information Boards Will Be Placed Immediately After The Commencement Of Physical Implementation
|