Part No. 1 - Construction Of Roadside Ditches With Culverts And Cutting Of Roadsidesa. Basic Scope: Mechanical Earthworks - Excavations And Trenches Made With Excavators For Disposal, Soil Category Iii-Iv - 20 M3 - Distribution Of Soil Extracted From Linear Excavations With Bulldozers, Up To 1 M3 Of Soil Lying Along The Edges Along The Length Of 1 M Of The Excavation, Soil Category I-Iv - 10 M3 - Earthworks With Excavators With Transport Of Excavated Material By Self-Unloading Vehicles To 2·Km, Land Category Iii-Iv - 350 M3 - Supplementary Expenditure For Each Additional 0.5·Km Of Transport Distance, Over 2·Km By Self-Unloading Vehicles, On Terrain Or Dirt Roads, Land Category Iii-Iv. – 10 M3- Other Excavator Work 0.15-0.25 M3 Not Included In Item 1.1 To 1.4 - 350 Hours - Works Performed With Motor Graders - 160 Hours Road Culverts - Pipe Culverts Under Exits, Corrugated Hdpe Pipes Fi 60 Cm, Including Excavation For The Structure And Backfilling With Compaction, With An Average Ditch Depth Of Up To 1.00 M. – 12 M- Pipe Culverts Under The Exits, End Walls For Pipes Fi 60·Cm – 2 Pcs.- Turfing, For The Wall (Cutting) With Panel Dimensions 30X30·Cm/Turf Abutments/ - 5 M2- Pipe Culverts Under The Exits, Corrugated Hdpe Pipes Fi 40·Cm, Including Excavation For The Building And Backfilling With Compaction, With Average Ditch Depth Up To 1.00 M. – 18 M- Pipe Culverts Under The Exits, End Walls For Pipes Fi 40·Cm – 2 Pcs.- Cleaning The Silt From The Pipe Culverts, Silting Up To 2/3 Of The Diameter. - 35 M Cutting Of Roadsides - Mechanical Cutting Of Roadsides, Up To 10 Cm Thick, With Transport Of Excavated Material Up To 2 Km - 200 M2. The Ordering Party Does Not Provide For Additional Remuneration For Transporting The Equipment To The Place Of Work. The Ordering Party Provides For A Minimum Scope Of Implementation Of 60%. The Implementation Of The Subject Order Has No Impact On Ensuring Accessibility For People With Special Needs. The Detailed Scope Of Works Is Specified In The Following Documents: 1) Technical Specification For Execution And Acceptance Works, 2) Bills Of Quantities. Equivalent Solutions: The Types Of Materials And Equipment Specified In The Bills Of Quantities, St Are Given To Determine The Minimum Technical Standard. The Contractor Of The Works Has The Right To Replace Them With Materials And Devices With At Least Equivalent Technical Parameters, Provided That The Assumed Technical Standards Are Achieved. The Contractor Proposing Equivalent Materials And Devices Is Responsible For Checking The Possibility Of Using Them In The Implementation Of The Subject Of The Order In All Respects (Including, For Example: Properties, Dimensions, Weight, Method Of Transport And Assembly). The Contractor Who Refers To Equivalent Solutions Is Obliged To Demonstrate That The Solutions He Offers Meet The Requirements Specified By The Ordering Party. In Such A Case, The Contractor Attaches To The Offer A List Of Equivalent Solutions Along With Its Descrip
Contact Information
Address
Gmina Leżajsk,Leżajsk,37-300,Podkarpackie,Pl824 - Tarnobrzeski
Email
zamowieniapubliczne@poczta.gminalezajsk.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108363986
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.