|
Lot 1 - 8.10.05.1493-1 - Deforestation Deforestation And Cleaning Of Area With Trees Up To 015 M In Diameter, Lot 1 - 8.10.05.1494-0 - Excavation And Loading Of Deposit Material With 156 M Hydraulic Excavator, Lot 1 - 8.10.05.1495-8 - Compaction Of Landfills 100 Meters From Intermediate Proctor, Lot 1 - 8.10.05.1496-6 - Mechanical Demolition Of Reinforced Concrete With Hydraulic Excavator, Lot 1 - 8.10.05.1497-4 - Regularization Of Botafora With Spreading And Compaction, 02/02/2026 - 15:03:04, Lot 1 - 8.10.05.1498-2 - Transport With 10 M Dump Truck On Natural Bed Highway, Lot 1 - 8.10.05.1499-0 - Transport With 10 M Dump Truck On Paved Highway, Lot 1 - 8.10.05.1500-8 - Final Disposal Of Solid Waste Demolition Material And Final Disposal In Appropriate Location Authorized And/Or Licensed By Environmental Licensing Bodies Upon Proof Of Disposal, Lot 1 - 8.10.05.1501-6 - Mechanical Excavation Of Trench In Material Of 1 Category, Lot 1 - 8.10.05.1502-4 - Excavation Of Trench In 3 Category Material, Lot 1 - 8.10.05.1503-2 - Backfilling With Sand All Included In Urban Roads, Lot 1 - 8.10.05.1504-0 - Rockfilling Of Scattered And Mechanically Compacted Stone Commercial Hand Stone Supply And Laying, Lot 1 - 8.10.05.1505-9 - Shoring For Cellular Manhole Body 3-Time Use Production, Installation And Removal, Lot 1 - 8.10.05.1506-7 - Hdpe Pipe For Drainage D 400 Mm Supply And Installation, Lot 1 - 8.10.05.1507-5 - Hdd Pipe For Drainage 600 Mm Supply And Installation, Lot 1 - 8.10.05.1508-3 - Body Of Bscc Closed Section Of 15 Of Concrete Mfc 05 Commercial Sand And Crushed Wood Form, Lot 1 - 8.10.05.1510-5 - Boca De Lobo Simple Concrete Grid Blsg 01 Commercial Sand And Crushed, Lot 1 - 8.10.05.1511-3 - Boca De Btcc 150 Brita Comerciais, Lot 1 - 8.10.05.1512-1 - Concrete Fck 30 Mpa Made In A Concrete Mixer And Manually Casting Extracted Sand And Crushed Stone Produced, Lot 1 - 8.10.05.1513-0 - Cyclopean Concrete Fck 20 Mpa Made In A Concrete Mixer And Manually Casted Crushed Sand And Hand Stone Commercial, Lot 1 - 8.10.05.1514-8 - Ca50 Steel Frame Supply Preparation And Placement, Lot 1 - 8.10.05.1515-6 - 10 Mm Resin Plywood Forms General Use 3-Time Use Production Installation And Removal, Lot 1 - 8.10.05.1516-4 - Application Of Needled Nonwoven Geotextile With Longitudinal Tensile Strength Of 31 Knm, Lot 1 - 8.10.05.1517-2 - Reconnection Of Water Network In Pvc Pba Cl 15 Dn 100 Mm Including Connections On Urban Roads, Lot 1 - 8.10.05.1518-0 - Relocation Of Connection And Reconnection Of Sewage Networks On Urban Roads, Lot 1 - 8.10.05.1519-9 - Sewerage Of Excavations To Lower The Water Level In Manhole Services Galleries And Others With Motor Pump Set, Lot 1 - 8.10.05.1520-2 - Removal Of Existing Culverts, Lot 1 - 8.10.05.1521-0 - Regularization Of Botafora With Spreading And Compaction, Lot 1 - 8.10.05.1522-9 - Transport With 10 M Dump Truck Natural Bed Highway, Lot 1 - 8.10.05.1523-7 - Transport With 10 M Dump Truck Paved Highway, Lot 1 - 8.10.05.1524-5 - Final Disposal Of Solid Waste Demolition Material And Final Disposal In Appropriate Location Authorized And/Or Licensed By Environmental Licensing Bodies Upon Proof Of Disposal, Lot 1 - 8.10.05.15
|