|
1. The Subject Of The Order Is The Implementation Of The Investment Entitled: Reconstruction Of Bathrooms, Social Rooms And Renovation Of Office Rooms In The Bolesław Commune Office. The Task Will Be Carried Out On The Basis Of Design Documentation And Bill Of Quantities.2. The Scope Of Implementation Of The Subject Of The Order Includes In Particular:2.1. Reconstruction Of The Sanitary And Social Facilities Located On The Ground Floor And First Floor Of The Bolesław Commune Office. As Part Of The Investment, It Is Planned To Change The Arrangement Of Internal Partition Walls In Order To Create A New Room Plan, In Particular: On The Ground Floor Of The Building: - Toilets For The Disabled, - Womens Toilets, - Mens Toilets - Social Room On The Ground Floor Of The Building; On The First Floor Of The Building: - Womens Toilet, - Mens Toilet, - Social Room, - Utility Room.2.1.1 The Scope Of Works To Be Performed Will Include In Particular: A) Demolition Works: − Dismantling Walls, − Dismantling Pipelines, − Dismantling Sanitary Equipment, − Dismantling Suspended Ceilings, − Dismantling Doors With Door Frames, − Dismantling Tiles From Walls And Floors, B) Reconstruction Works: − Partition Walls, − Plasters, − Floors, C) Finishing Works: − Laying Plaster, Painting Walls, − Installation Of Internal Doors, − Installation Of Suspended Ceilings From Plasterboards, − Installation Of Tiles On Floors And Walls, D) Execution Of Sanitary And Central Heating Installation Works, Installation Of A Softener In The Basement, E) Adaptation Of The Internal Electrical Installation To The New Designed Installation: − Installation Of Lighting Points, Switches And Sockets, − Installation Of A Call System In The Toilet For Disabled, − Carrying Out Tests And Measurements, F) Carrying Out Assisted Mechanical Ventilation, G) Installing Fittings (Washbasins, Urinals, Toilets) And Equipment, H) Making Custom-Made Furniture And Installing Household Appliances (In Energy Class A) In Social Rooms.2.2. Renovation Of Two Office Rooms Located On The First Floor Of The Bolesław Commune Office Building And One Office Room And The Adjacent Corridor Located On The Ground Floor Of The Bolesław Commune Office Building.2.2.1. The Scope Of Work To Be Performed Will Include In Particular: - Plastering And Painting Of Walls, - Replacement Of Floors With Vinyl Panels, - Installation Of A Suspended Raster Ceiling, - Adjustment And Installation Of Lighting.
|