Reconstruction Of The Pond (Water Reservoir No. 1) In Stara Wieś4.1 The Subject Of The Order Is A Construction Work Called Reconstruction Of The Pond (Water Reservoir No. 1) In Stara Wieś. The Investment Includes: 1) Preparatory Works: Measuring Works For Surface Earthworks - Leveling The Area For The Pond, 2) Earthworks: A) Earthworks With An Excavator, B) Transport Of Excavated Material, C) Transfer Of Soil, Sticking Soil, D) Production And Maintenance Of Wooden Mattresses For The Excavator, E) Forming And Compacting Embankments, F) Backfilling Of Excavations. 3) Construction Works: A) Making Sand Bedding For The Mattresses, B) Strengthening The Slopes With Hydrotechnical Geotextile, C) Building An Openwork Palisade Supporting The Mesh-Stone Mattresses On The Slopes, D) Making Mesh-Stone Mattresses On The Slopes, E) Pinning The Mesh-Stone Mattresses To The Ground With Live Pins Capable Of Regrowth, F) Topsoil And Sowing Of Slopes, G) Casing Of Rain Collector Outlets, H) Reconstruction Of Damaged Pavement, I) Construction Of A Protective Barrier Made Of Galvanized Steel Pipes, J) Construction Of A Slope Drainage, K) Construction Of A Recreational Pier With Dimensions Of 25 M X 3 M + 10 M X 3 M On The Reservoir. Scope Of Work And Responsibility Of The Contractor Within The Scope Of The Proposed The Offer Price Also Includes: 1) Organization And Development Of The Construction Site, 2) Organizing Construction Facilities And The Supply Of Utilities (Electricity, Water, Etc.) On Your Own And At Your Own Expense, 3) Marking And Securing The Works Performed And Ensuring Safety On The Construction Site, 4) Developing And Obtaining Approval From The Relevant Authorities Of A Traffic Organization Plan For The Duration Of Construction Works - If Necessary, 5) Obtaining A Permit To Occupy The Road And Paying A Fee For This - If Necessary, 6) Carrying Out All Arrangements With The Relevant Administrative Authorities - For This Purpose, The Ordering Party Will Issue Appropriate Authorization To Act On Behalf Of The Ordering Party, 7) Organizing And Carrying Out The Necessary Tests, Examinations And Acceptances, As Well As Possible Supplementation Of The Acceptance Documentation For The Scope Of Works Covered By The Subject Of The Order, 8) Providing Surveying Services By Authorized Surveying Services, Including Field Marking And As-Built Inventory, 9) Obtaining On Behalf Of The Ordering Party: A) Arrangements Resulting From Decisions And Permits - To The Extent That This Is Necessary Required, B) All Documents Necessary To Submit A Notice Of Completion Of Construction To Pinb In Puławy, 10) Obtaining A Non-Final Decision On Behalf Of The Ordering Party Allowing The Use Of The Facility (The Application For An Occupancy Permit Will Be Submitted To The Competent Authority By The Contractor On Behalf Of The Ordering Party), 11) The Contractor Is Obliged To Transport Garbage And Material Waste To The Landfill On His Own. The Costs Related To Landfill Fees Are Bor
|