|
Construction Work – Design And Construction Of Nagykálló Training School. Nagykálló Internal Area 850/1. Planning And Execution Of The Construction Of A New Swimming Pool On A Hrs Property. Design And Construction Of A Newly Built Training Center By Adapting The Licensed And Construction Plans Of The Ttt2 Training Center. During The Plan Adaptation, The Plans Must Be Prepared In Such A Way That They Comply With The Local Settlement Planning, Townscape And Other Legal Regulations Of The Place Of Construction, As Well As With All Site Features That Influence The Architectural, Support Structure And Other Design And Construction. The Facility Is A Three-Story Building Containing A 15 M X 25 M Large Pool With A Water Depth Of 1.90 M And A 6 M X 10 M Teaching Pool With A Water Depth Of 0.8 M. The Water Engineering Is Located On The Basement Level, The Lobby, Cash Register, Changing Rooms, Pools, Toilets, Storage, And Mechanical Rooms Are Located On The Ground Floor, And The Air-Conditioning Equipment Is Located In The Attic. Built-In (Useful) Floor Area Of The Planned New Swimming Pool: 1,311.8 M2. The Teaching Pool Is 60 M2, The Swimming Pool 375 M2. The Total Water Surface Is 435 M2. Planning Task: - Preparation Of Construction Permit Plans For The Swimming Pool Building, The Road And Parking Lot, The Park, And Utilities, - All Kinds Of Licensing, Coordination With Specialized Authorities And Authorities, And - Preparation Of Construction Plans For The Swimming Pool Building, The Park, The Road And Parking Lot, And Utilities. It Is Necessary To Prepare The Authorization And Construction Plan Documentation Using Bim Methodology, Based On What Is Recorded In The Bim Implementation Plan. The Winning Tenderer Is Obliged To Provide Design Supervision To The Extent Necessary Until The Completion Of Construction. Execution Based On The Construction Plans, Full-Scale Construction Of A Building Intended For An Indoor Swimming Pool, With Related Swimming Pool Technology, Environmental Planning, And External Utility Construction Works. Tenderer 321/2015. (X. 30.) On The Basis Of Section 46 (3) Of The Government Decree, It Is Established That The Reference To A Thing, Process, Activity, Person, Patent Or Trademark Of The Make, Origin, Type Specified In The Invitation To Initiate The Procedure And In The Public Procurement Documents Was Made Only In Order To Clearly Define The Nature Of The Object, And The Name Must Be Understood As Or Equivalent.
|