1. The Master Plan Approved By The Local Executive Authority; 2. Indication Of The Class Of Facilities According To The Degree Of Responsibility; 3. Preparation Of The Safety Declaration And Agreement With The Relevant Organization; 4. Preparation Of Project Drawings; 5. Preparation Of Estimate Documents; 6. Preparation Of Construction Organization; (In Print And Electronic Version) 9. Mfa, Etsn, Gigeyna, Etc. Payment Of Expertise Costs By The Designer, Repair And Adjustment Of Entrance Door (Gateway) And Electrical Components, Emptying And De-Silting Of The Stations Internal Canals And Storage, Inspection And Insulation Of Water Channels From Doors To Grill, Installation Of A Level Measuring Device In Channels, Inspection, Repair And Commissioning Of Grating, Ensuring The Automatic Operation Of The Grates Depending On The Level Measuring Device In The Electric Control Box, Repair And Commissioning Of The Hoist, Removal, Cleaning, Inspection And Commissioning Of Flyugt 3153 Centrifugal Pumps, Providing And Installing Chains Made Of Stainless Material With Suitable Load Capacity For Lifting Flyugt 3153 Pumps, Installation Of A Level Measuring Device In The Warehouse, Ensuring The Automatic Operation Of Pumps Depending On The Level Measuring Device In The Electric Control Box, Restoration And Painting Of Iron Caps On The Floor, Installation Of A Methane Gas Analyzer Inside The Warehouse, Design And Installation Of Forced Ventilation System Inside The Warehouse
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108173271
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.