|
1. The Subject Of The Order Is The Renovation And Reconstruction Of The Kitchen With Kitchen Facilities At Primary School No. 7 In Jaworzno At Ul. Ławczana 12. Execution Of Works In The Scope Of: 1) Construction: The Works Include: Disassembly Of Internal Door And Window Joinery, Dismantling Of Room Equipment And Ventilation Installations, Dismantling Of Expansion Joint Covers, Demolition Of Partition Walls And Drilling Of The Load-Bearing Wall With Installation Of New Lintels, Removal Of Damaged Plasters, Replenishment Of The Existing Ones And Execution Of New Ones, Removal Of Existing Floors And Construction Of New Ones, Construction Of Partition Walls, Construction Of Casing For Ventilation Ducts, Works Installation: Electrical, Water And Sewage, Central Heating And Ventilation, Finishing Works, Installation Of Equipment And Furniture.2) Sanitary Installation: The Works Include: Disassembly Of Existing Installations, Sanitary Utensils Together With Their Equipment, Fastenings And Insulation Within The Rooms Undergoing Renovation, Installation Of Galvanized Steel Ventilation Ducts With Suspensions, Supporting Structures, Dampers And Other Elements Necessary For The Proper Operation Of The Installation, Installation Of Wall Fans, Duct Fans And Kitchen Fans, Installation Of The Central Unit Supply Air Conditioner, Installation Of A Split Air Conditioner, Installation Of Supporting Structures, Installation Of Diffusers, Exhausters, Ventilation Grilles With Hangers And Accessories, Installation Of Air Intakes And Exhaust Ducts, Installation Of Cleaning Doors, Insulation Of The Ventilation Installation, Installation Of Regulation And Control Devices, Installation Of A New Water Installation - Installation Of Pipes With Hangers And Fittings, Insulation Of Water Pipes, Installation Of A New Sanitary Sewage System Made Of Pvc Pipes - Installation Of Pipes With Slings And Fittings, Installation Of Fittings, I.E. Shut-Off Valves, Quarter Turn Valves, Thermostatic Valves, Etc. Installation Of Sanitary Utensils, E.G. Washbasins, Floor Drains, Frames, Sinks, Siphons And Faucets, Making Electrical Connections And Automation Controlling The Operation Of Individual Devices, Preparing Operating And Maintenance Instructions For The Installation, Commissioning Installations And Devices, And Testing In Accordance With Cobrti Instal Requirements, In Particular Tightness Tests, Rinsing, Disinfection, Marking Devices, Flow Directions, Etc. 3) Electrical Installation: The Works Include: Dismantling Works, Power Supply Of Modernized Rooms From The Internal Installation Designed Lv Switchboards, Receiving Installations For Sockets And Lighting, Installations Supplying Power To Kitchen Technology Devices, Installations Supplying Sanitary Equipment, Reconstruction Of Motion Detectors Of The Sswin System. 4). Interior Furnishings: The Works Include: Disassembly And Assembly Of Room Furnishings In Accordance With The Design. In Accordance With: 1) Land Development Design An
|