Architectural, Engineering And Planning Services – Traunreut Youth Settlement - Implementation Of Fire Protection Measures - Tga Planning Elt (Alg 4+5) - Lph 5-9. Jugendsiedlung Traunreut - Private Vocational School For Special Educational Support In Traunreut, Funding Focus On Learning, The Jugendsiedlung Ggmbh And Private Vocational School For Social Care For Special Educational Support In Traunreut, Funding Focus On Learning, The Jugendsiedlung Ggmbh. - Elimination Of Fire Protection Deficiencies. The Building Was Built In The Mid-1980S And Was Structurally Modified In Several Extensions. The Vocational School Has Up To 1,000 Students In Around 100 Different Classes. The Building Complex Is A Private, State-Recognized Vocational School For People With Higher Needs. Various Apprenticeships Can Be Learned Here. The Building Extends From The Basement To The 1St Floor And Parts Of The 2Nd Floor. Air Spaces Across Floors, Galleries, Built-Ins And Looped Corridors Characterize The Architecture. Wood Paneling Can Be Found Extensively Throughout The Building Complex. A Risk Analysis (Fire Protection Proof) Underlines The Need To Upgrade Corridors And Stairwells That Are Used For Rescue And To Set Up A Functioning Escape Route System. The Main Focus Of The Renovation Is On The Following Areas: 1. Corridors In The Basement, 1St Floor And 2Nd Floor To Be Made Fire-Safe And Free Of Fire Loads 2. Existing Stairwells To Be Renovated In A Fire-Safety Manner And Freed From Fire Loads 3. Creation Of Additional Escape Routes And External Stairs To Create A Functioning Escape Route Concept 4. Installation Of A Comprehensive Fire Alarm System For Early Detection With Internal Alarming 5. Retrofitting Of All Technical Systems In The Interface Of Fire Protection Renovation And Beyond Where Appropriate. Service Phases 1 To 4 Have Already Been Provided For The Measure. Selected Planning Documents Will Be Made Available With The Publication, Further Documents Will Then Be Made Available With The Invitation To The Stage 2 Negotiation Process. In Terms Of Building Law, There Is A Tested Fire Protection Certificate And An Associated Building Permit For The Measure. The Measure Is Funded In Accordance With Article 34 Sentence 2 Of The Bavarian School Financing Act (Bayschfg) With The Reimbursement Of The Necessary Costs Of Approved Construction Measures For Private Special Schools. The School Supervisory Approval Is Available. The Prescribed Funding And Award Guidelines Must Be Observed When Implementing The Measure. The Cost Calculation (Kgr. 300 – 700) Amounts To Around €5.2 Million Gross. The Measure Is Planned To Be Implemented In Several Construction Cycles And In Sections. Current School Operations Must Be Taken Into Account. Noisy Work Should Be Done During The Holidays. Based On Current Knowledge, The Builder Is Assuming A Construction Period And Distribution Of The Measures Over Four Years. As Part Of The Building Property Planning, The Services For Fire Protection According To Aho 2022, Issue 17 Level 3 (Advice As Part Of The Implementation Planning Regarding B
Contact Information
Address
Waginger Straße 8
Contact No.
+49 8631166630
Email
vgv@hsp-projekt.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108037448
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.