Composting Plant Construction Work - Implementation Of Engineering (Work Design, Construction, Delivery And Installation Of The Necessary Technological Equipment And Exercise Of Authors Supervision) On The Site Construction Of A System For Separate Collection Of Green And Biodegradable Waste From The Population Of The Municipalities: Lukovit, Teteven, Yablanitsa And Roman And Construction Of A Composting Installation With Aerobic Bio-Stabilization In A Bioreactor. Activity 1. Development Of An Investment Project In The Working Project Phase; Activity 2. Implementation Of The Smr On The Basis Of The Developed And Approved Work Investment Project, In Compliance With The Requirements Of All Laws, Regulations, And Standards Currently In Force In The Republic Of Bulgaria, Regarding The Implementation Of Objects And Works Of This Nature. The Cmp Activities To Be Carried Out Include: Construction Of An Administrative Area. The Administrative Area Includes An Administrative Building With A Changing Room, Staff Toilets, Staff Bathrooms And Pedestrian Walkways. Construction Of An Area For Unloading, Intermediate Storage And Preliminary Treatment Of Compost Material. The Area Includes An Unloading And Pre-Treatment Area. The Area Is A Concrete Platform For Maneuvering And Manipulation. Warehouse For Temporary Storage Of Compost Material. The Necessary Capacity Of The Warehouse Is For The Storage Of Material With A Volume Of 700 M3 Construction Of An Intensive Fermentation Zone With Aerobic Bio-Stabilization. In This Area, A Stationary Closed-Type Aerobic Bioreactor Will Be Located Under A Canopy. To Place The Bioreactor, It Is Necessary To Build A Foundation. Construction Of A Composting Area In Rows, With An Approximate Area Of 70X35 Meters, Including The Construction Of 4 Pcs. Compost Rows Asphalt Concrete Maneuvering Area. Construction Of A Ready Compost Storage Area, The Area Is Divided Into: Compost Processing Area Ready Compost Warehouse. The Storage Of The Finished Compost Is Carried Out On A Reinforced Concrete Site Measuring 20 X 35 Meters, Under A Metal Shed. Storage Capacity For Ready Compost 576 M3 Ready Compost. Site Water Supply Sanitary And Domestic Water Supply Site Sewerage Site Electricity Supply Grounding System Hvac Installations Internal Roads - Internal Road With A Length Of 325 M, Incl. Sidewalks. On The Basis Of Art. 137, Para. 1, Item 2, Letter D Of Zut, As Well As Art. 4, Para. 4 Of Ordinance No. 1 Of 30.07.2003 On The Nomenclature Of Types Of Construction, The Construction Is The Construction Of A Composting Plant For Separately Collected Biodegradable Household Waste And The Site Is Second Category, And According To The Rules For The Procedure For Entry And Maintenance Of The Central Professional Register Of The Builder - Art. 5, Para. 6, Item 4, Subsection 4.2.2, The Same Object Is Classified In The Fourth Group Of Constructions. Activity 3. Delivery, Installation And Start-Up Of A Composting Plant With Aerobic Bio-Stabilization. The Activity Includes The Supply Of The Following Technological Equipment: Delivery, Installation And Start-Up Of A Closed-Type Aerobic Bioreactor For Food Waste - 5000 Kg/Day, Dispenser, Enzyme Addition System, Equipped With - Receiving Hopper And Mixer - Screw/Belt Conveyor For Bioreactor Inlet - Screw/Belt Conveyor For Bioreactor Outlet - Control Panel, Automation And Control - Activity 4. Exercise Of Author Supervision During Execution Of The Construction In Scope According To Art. 162 Of The Zut. According To Art. 162, Para. 2 And 3 Of Zut, The Conditions
|