|
Tender For Electrification of different type of work under deposit scheme for EDD Deoria-2 Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- 3 PCC Pole 8.5 mtr long 4 PCC Pole 11 Mtr Long 5 3x185sq mm xlpe 11 K.V Cable 6 3x120sq mm xlpe 11 K.V Cable 7 11 K.V Cable Jointing Kit (3x120sq mm) 8 11 K.V Cable Jointing Kit (3x185sq mm) 9 M.S Channel (Dropper) 10 M.S Top Channal 11 11 K.V Fuse Set 12 400 KVA T/F 13 ACSR Weasel Conductor 14 M.S Angle Iron 65x65x6 mm 2700 mm Long Bracing With 4 Clamp 15 Earthing Complete 16 11 KV PPMC CTR 25/5 A 17 11 KV TVM Meter 18 11 KV CT/PT pole mounated unit CTR 10/5A 19 M.S. angle 75x75x6x2028 mm with clamp T/F base 20 Supply of following material/fitting complete in all respect- 21 Stone Pad 22 G.I Pipe 6 Dia 23 Copper L-Piece 50x225x10mm(L.S) 24 Al lug Long Barrel off size 25 Nuts & Bolts off size 26 Erection of Double Pole with Grouting of Pole 27 Earthing of Pole 28 Laying of 11 KV XLPE Cable by Digging/Drilling method 29 Erection of 11 KV XLPE Cable Jointing Kit with complete work 30 Installation of Fuse Set 31 Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. 32 Erection, commissioning & Testing of 400 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. 33 Chemical earthing of Transformer (Materials will be provided by contractor) 34 Construction of T/F plinth with grouting of channel (All required materials will be provided by the contractor) 35 Pale Fencing 36 Installation of PPMC (25/5A) with 11 KV TVM Meter 37 Chemical earthing of PPMC (Materials will be provided by contractor) 38 Installation of CT/PT unit with 11 KV TVM Meter 40 Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- 41 S.T Pole 11 MTR 42 ACSR wesal Conductor 43 E Bracket 44 11 K.V Pine Insulator (Polimeric) 45 11 K.V Dis Insulator Fitting (Polimeric) 46 100 KVA T/F 47 Top channel 48 Dropper angle 49 Fuse Set 50 T/F Base 51 Earthing Complete 52 Stay Complete 53 Supply and installation of following material/fitting complete in all respect- 54 Clamp For Top & Dropper Channal 55 3.5x70 sq mm Armourd Cable With Catenary 56 Erection of Double Pole with Grouting of Pole 57 Earthing of Pole 58 Installation of Fuse Set 59 Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. 60 Erection, commissioning & Testing of 100 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. 61 Erection and grouting of stay with nozelling and binding of stay wire (Complete work) 63 Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- 64 11 Mtr Long S.T Pole 65 ACSR Weasel Conductor 66 11 KV Steel X-Arm 67 F-Bracket 68 11 KV Pin Insulator With Pin 69 11 KV Disc Insulator with Fitting 70 63 KVA T/F 71 11 KV T-OFF Chanael 72 Top Chanael 73 Droper Angle 74 T/F Base 75 Earthing Complete 76 Stay Complete 77 Fuse Set 78 Supply and installation of following material/fitting complete in all respect- 79 Clamp for X-arm 80 Clampe for T-OFF, Top Channel & Droper Angle 81 Erection of Single Pole with Grouting of Pole 82 Erection of Double Pole with Grouting of Pole 83 Earthing of Pole 84 Installation of Fuse Set 85 Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. 86 Erection, commissioning & Testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. 87 Erection and grouting of stay with nozelling and binding of stay wire (Complete work) 89 Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- 90 PCC Pole 8.5 MTR Long 91 ACSR Weasl Conductor 92 11 KV Pin Inshulator 93 "V" Type x-arm 94 F Bracket 95 Top Channal 96 Dropper Channal 97 T/F Base 98 63 KVAT/F 99 L.T ABC (3x120+1x95+1x16) sq mm 100 Three Phase Distribution Box 101 Earthing Complete 102 Stay Complete 103 11 KV Fuse Set 104 Supply and installation of following material/fitting complete in all respect- 105 Stone Pad 106 Clamp For "V" Type X-Arm 107 Clamp For Top Dropper 108 Suspension Clamp 109 Dead End Clamp 110 Eye -Hook 111 J- Hook 112 Clamp For Three Phase Distribution Box 113 Erection of Double Pole with Grouting of Pole 114 Earthing of Pole 115 Installation of Fuse Set 116 Laying, stringing, sagging, binding and jumpering of AB Cable with fixing of accessories. 117 Erection, commissioning & Testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. 118 Installation of Three Phase Distribution Box with its fitting 119 Erection and grouting of stay with nozelling and binding of stay wire (Complete work) 121 Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- 122 PCC Pole 8.5 mtr long 123 ACSR Weasel Conductor 124 Supply and installation of following material/fitting complete in all respect- 125 L.T Clamp 126 Stone Pad 127 L.T Shackel Insulator 128 Bolt & Nut For Shackel Insulator 129 Stay Complete 130 Concreting of Stay 131 2x6mm PVC Armoured Cable 132 Erection of Pole with concreting and grouting of Pole 133 Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. 134 Erection and grouting of stay with nozelling and binding of stay wire (Complete work) 135 fo|qr forj.k [k.M nsofj;k ds vUrxZr tek ;kstuk esa Lohd`r jsyos LVs"ku vfgY;kiqj gkYV] tuin&nsofj;k ds ifjlj ij la;kstu gsrq fo|qrhdj.k ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %& 136 Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- 137 PCC Pole 8.5 MTR Long 138 STP Pole 11 MTR Long 139 ACSR Weals Condutor 140 "V" Type X-Arm 141 11 KV Pin Insulator With Polymaric 142 11 KV Disc Insulator With Polymaric 143 M.S Earthing Rod (2540x20 mm) 144 Earthing G.I Wire 7.16 6 SWG 145 Stay Rod (16x1800 mm) 146 Stay Wire (3.15 mm)7/10 SWG (GSS Wire) 147 MS angle 75x75x6x2028 mm with Clamp & Bolts Nut (T/F Bause) 148 MS Channal Dopper (100x50x2028 mm) 149 MS Top Channal (125x65x2240 mm) 150 T/F 0.4KV,63 KVA 151 Supply and installation of following material/fitting complete in all respect- 152 Stone Pad 300x75 mm 153 F- Breacket For Fitting Top Insulator With Bolts &Nut 154 Cross Arm holding Clamp With Nut & Bolts 155 Clamp For Stay 156 Stay Insulator 157 Clamp For Top & Dropper Channal & Tee of channal 158 ALLUMINIUM CRIMPING LUG 159 Dopper L-Piece 50x225x10 mm(L.S) 160 Al Leg Long Barrel off size (lS) 161 Erection of Double Pole with concreting and grouting of Pole 162 Erection of Pole with concreting and grouting of Pole 163 Earthing of Pole 164 Installation of Fuse Set 165 Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. 166 Erection, commissioning & Testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. 167 Erection and grouting of stay with nozelling and binding of stay wire (Complete work) 169 Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- 170 S.T Pole 11 MTR 171 ACSR wesal Conductor 172 E Bracket 173 11 K.V Pine Insulator With Pin 174 11 K.V Dis Insulator With Fitting 175 25 K.V.A T/F 176 Top channel 177 Dropper angle 178 Fuse Set 179 T/F Base 180 Stay Complet 181 Earthing Complet 182 Supply and installation of following material/fitting complete in all respect- 183 Clamp For Top & Dropper Channal 184 4x25 sq mm Cable Armourd Cable With Catenary Wire 185 Cross Arm holding Clamp With Nut & Bolts 186 Erection of Double Pole with concreting and grouting of Pole 187 Earthing of Pole 188 Installation of Fuse Set 189 Erection, commissioning & Testing of 25 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. 190 Erection and grouting of stay with nozelling and binding of stay wire (Complete work) Please Enable Macros to View BoQ information
|