|
1. The Subject Of The Order Is The Investment Task Entitled: Construction Of Lawendowa Street In Goleniów Together With Technical Infrastructure, Including The Performance Of All Works Leading To The Achievement Of A State Consistent With The Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, Swz And The Draft Provisions Of The Public Procurement Contract. 2. The Scope Of The Subject Of The Order Includes The Construction Of A Section Of A Municipal Road With Intersections With The Municipal Road Ul. Walenych (Plot No. 53/14) And The District Road Ul. Sadowa (Plot No. 275/1). The Investment Includes The Construction Of A Public Municipal Road In Plot No. 53/15, The Construction Of An Internal Road In Plot No. 53/7, The Hardening Of Plot No. 45/1, The Construction Of Three Sections Of The Storm Sewage System With Infiltration, The Construction Of A Service Channel, The Height Regulation Of Existing Lampposts And The Protection Of Existing Sections Of The Telecommunications, Energy And Gas Networks With Bipartite Protective Pipes. The Scope Of The Study Covers The Area Of Plots No. 45/1, 53/7, 53/14, 275/1, Goleniów District - 3, Goleniów City, And Plot No. 275/1, Goleniów District - 3, Goleniów City. 3. The Following Works Are Expected To Be Performed As Part Of The Subject Of The Order: A) Demolition Of The Existing Road Surface Made Of Recycling Aggregate, B) Demolition Of Hardened Surfaces, Exits And Sidewalks Made Of Concrete, Concrete Cubes And Paving Slabs, Together With The Disposal Of Demolition Materials, C) Construction Of A New Road With A Surface Made Of Concrete Cubes Along With Sidewalks, Entrances To Properties And Parking Lots For Passenger Cars, D) Construction Of Exits To Adjacent Properties Is Planned With A Surface Made Of Concrete Cubes Limited By A Concrete Retainer, E) Construction Of A New Sidewalk Along The Road On The Eastern Side, A Sidewalk Should Be Constructed Along The Entire Length Of The Designed Road, F) Tidying Up The Green Areas Of The Road Lane, Covering It With Topsoil And Sowing It With Grass, G) Construction Of A Rainwater Drainage System With Underground Infiltration Tanks, H) Construction Of A Service Channel, I) Height Adjustment Of Existing Street Lamps, J) Securing The Existing Underground Infrastructure With Two-Part Casing Pipes, K) Removal And Disposal Stumps (Remains After Tree Felling), Tree Felling And Wood Removal, L) Installation Of Vertical And Horizontal Markings.3.1. The Total Length Of The Road Construction Is: L1= 323.52 M L2= 70.90 Ml3= 48.69 Mltotal= 443.11 Mattention! The Ordering Party Informs That The Construction Project Of Ul. Lawendowej Also Includes Felling And Planting Trees, Which Are Excluded From The Scope Of The Contract And Are Not Subject To Valuation In The Offer. This Provision Applies (In Terms Of Felling And Planting) To Trees Specified In The Decision Of December 10, 2024 Constituting Annex No. 23 To The Swz. The Con
|