3. Description Of The Subject Of The Procedure And Order: The Investment Includes The Construction Of A Spa Promenade In Złockie - Stage I, Consisting Of: - Dismantling Small Architectural Objects, Lamps And Demolition Of Existing Hardened Surfaces, - Moving And Integrating Existing Flower Sculptures That Interfere With The Investment Into The Area, - Removing Existing Trees That Interfere With The Investment, - Construction Of Small Architectural Objects, - Construction Of A Fence In The Form Of Repeatable Sections Of Variable Length (Stone Wall Fence With A Pedestal), - Construction Of Pedestrian, Bicycle And Pedestrian Routes, - Reconstruction And Security Of The Telecommunications Network, - Reconstruction And Security Of The Tauron Network, - Construction Of A Broadband Telecommunications Network (Cctv), - Construction Of An Area Lighting Network And Infrastructure Power Supply, - Construction And Reconstruction Of Water Supply Connections, - Construction Of Sanitary Sewage Connections, - Implementation Of Plant Plantings.3.1 Scope Material Scope: Material Scope Determined On The Basis Of: - Design Documentation Approved By The Decision Of The Staroste Of Nowy Sącz, Reference Number: Bud.6740.1411.2025 Of August 22, 2025. - Notification Of October 31, 2024 Regarding The Construction Of Small Architectural Objects In A Public Place, Register No. 168/7, 263 Rev. Złockie, - Reports From September 11, 2025. Regarding The Construction Of A Fence On Plot No. 112/25, 118/2, 168/6, 168/7, 263, 284/6 Rev. Złockie Register. - Annex No. 1A To Swz. A) The Contractor, As Part Of The Subject Of The Order, Is Obliged To Perform Construction Works In Accordance With The Construction Practice, Applicable Regulations And Standards, Based On The Prepared Documentation. B) The Contractor Will Ensure The Proper Performance Of All Works Related To The Implementation Of The Subject Of The Contract In Accordance With The Documentation And With Currently Applicable Standards, Construction Law Together With Implementing Acts And Other Applicable Regulations, In Particular The Construction Law Together With Implementing Acts. C) The Contractor Will Prepare As-Built Documentation In Accordance With Art. 3 Points 14 Of The Construction Law, Together With A Set Of Approvals, Certificates And Declarations Of Conformity For Built-In Materials And Devices. D) Completion Of The Subject Of The Contract Is Understood As The Performance Of All Works And Works Constituting The Subject Of The Contract, And In The Event Of The Requirement To Allow The Subject Of The Contract For Use, Completion Of All Activities Provided For By Law, Including Obtaining An Occupancy Permit On Behalf Of The Ordering Party Or Effective Notification Of The Competent Construction Supervision Authority About The Completion Of Construction And Handing Over, Together With A Complete Set Of As-Built Documentation, To The Ordering Party. E) The Deadline For The Completion Of The Subject Of The Contract Is T
|