|
1. The Subject Of The Order Is To Expand The Existing Institutional Form Of Care For The Youngest Children By The Nowe Commune. The Nursery Will Care For Children From The Age Of 20 Weeks Until The End Of The School Year In Which The Child Turns 3 Years Old Or, In Special Cases, Until The Child Turns 4 Years Old. The Facility Will Be Designed To Care For 19 Children By 3 Caregivers.2. Characteristic Parameters Determining The Size Of The Nursery Building. Building Area: Approx. 144 M2. Usable Area: Approx. 126.95 M2. Volume: Approx. 460 M3. Height: Approx. 3.50 M. Number Of Storeys: 1. Room Height: Min. 2.50 M3. Scope Of Construction Works:• Securing The Construction Site,• Dismantling Some Of The Existing Benches, External Lighting And Hardening Of The Area Within The Area Of The Works Being Carried Out,• Demolition Of Part Of The Existing Fence Of The Nursery Area,• Dismantling Of Some Of The Playground Equipment,• Demolition Of Part Of The Surface Of The Existing Playground,• Demolition Of Elements Of The Former Heat Pipeline (Foundations And A Heating Channel),• Marking Out The Facility,• Carrying Out Earthworks,• Execution Foundations, • Assembly Of The Nursery Building In Modular Technology, • Execution Of Installation Works (Water - Sewage, Electricity, Lightning Protection, Low-Current, Telecommunications, Heating, Ventilation And Air-Conditioning System) Inside The Building, • Execution Of Power, Telecommunications And Water Connections. – Can. Addition To The Building, • Production And Assembly Of Furniture (Buildings) Along With The Installation Of Devices In Hygienic And Sanitary Rooms And Rooms. Social • Construction Of An Access And Driveway For People With Disabilities To The Building (From The Parking Lot), • Construction Of A Sidewalk Between The Nursery Departments, • Reassembly Of Previously Dismantled Playground Equipment On The Playground, • Playground In A New Location, Including The Preparation Of A Safe Surface, • Reconstruction Of The Safe Surface Of The Playground, • Reassembly Of Previously Dismantled Benches, External Lighting Poles And Restoration Of The Area Hardening That Was Demolished And Damaged During Construction, • Leveling Area And Restoration Of Green Areas, • Cleaning Up The Construction Site And Adjacent Neighboring Areas.4. The Investment In Question Will Be Implemented Based On The Assumptions Of Universal Design, I.E. The Adoption Of Spatial Solutions Without Architectural Barriers Limiting The Use Of The Facility By People With Disabilities Or Those Requiring Special Care. In This Regard, Solutions Should Be Designed Such As External And Internal Communication, Hygiene And Sanitary Rooms Adapted For Wheelchair Users, As Well As The Installation Of A Recall Alarm In The Toilet, A Typhlographic Board And Braille Markings.5. At The Investment Design Stage, Applicable Technical And Construction Regulations Should Be Taken Into Account, In Particular The Regulation Of The Minister Of Infrastructure Of April
|