|
Tender For Annual Maintenance Of Unit#1 & Unit #2 And Their Associated Equipments Of Vyasi Power House, Hathiyari-- 1 In-situ repairing of underwater parts (MIV and its inlet & outlet pipelines). 2 In-situ repairing of underwater parts (Runner & guide vanes). 3 In-situ repairing of underwater parts (Spiral casing and stay vanes). 4 In-situ repairing of underwater parts (Draft tubes). 5 Cleaning and overhauling of turbine guide bearing. 6 Overhauling of oil pressure system of Turbine. 7 Overhauling of oil pressure system of MIV. 8 Pressure grouting in draft tube liner and turbine pit liner. 9 Repairing of sealing surface/bedding and setting works of Guide vanes of 60MW machine. 10 Repairing and overhauling of Penstock drainage valve, Draft tube drainage valve, Spiral casing drainage valve, Vacuum breaking valve etc. 11 Sampling and testing ofTGB oil . 12 Painting work of underwater parts and various turbine related equipment. 13 Replacement of MIV maintenance seal (J-seal). (If required) 14 Dismantling, repairing & overhauling of MIV door seal and Shaft seal. Overhauling & testing of electrical panels of GOV OPU pump-motor, MIV OPU pump-motor andboth leakage units. 15 Calibration of Oil level indicator & transmitter of oil sump, Electronic pressure switch on pressure receiver tank and other transducer in both OPU systems. 16 Replacing and providing of 02 no limit switches of MIV and 02 no air safety valve (working pressure: 60Kg/sq. cm) of OPU system. 17 Dismantling of Draft tube cone, fixing of dummy flange over draft tube & making plateform etc. 18 Dismantling and workshop repair of pivot Ring including repair/replacement of SS Liner plate, welding of damaged holes and drilling new holes for lower bush housing. 19 Workshop repair of Bottom Static labyrinth & Fixing of Bottom Static Labyrinth. 20 Repair of Lower Bush Housings including repair of its hole and replacement of damaged gun metal bushes / Replacement of Lower bush housing if required. 21 Dismantling and Workshop Repairing of Guide Vane. 22 Dismantling and Repairing of 13 Bladed Francis Runner along with 02 no runner cones, top and bottom moving labyrinth. 23 Repair of Upper Bush Housings including replacement of damaged gun metal bushes / Replacement of upper bush housing if required. 24 In-situ repair of top cover with repair / replacement of SS Liner plate by bolting arrangement. 25 Workshop repair of Top Static labyrinth & Fixing of Top Static Labyrinth. 26 Replacement of Turbine sealing Assembly. In-situ removal of rotating sleeve and MS segments mounting bolts from turbine shaft including welding, drilling and tapping of new holes. 27 Complete Assembling, alignment and commissioning of machine, with the help of Ex-BHEL mechniacl expert 28 Dismantling of brush gear cubicle, Chequered Plates, Bus Duct ends, 11KV BUS Bar, Cover Plates and DC terminals 29 Maintenance, Inspection and Overhauling of Upper Guide Bearing (UGB) Vapour seal 30 Maintenance, Inspection & Overhauling of Generator Upper Guide Bearing Pads, Top up & filtration of bearing oil 31 Maintenance, Inspection and Overhauling of Lower Guide Bearing (LGB) Vapour seal 32 Maintenance, Inspection & Overhauling of Thrust bearing and Lower Guide Bearing (LGB) Pads, Toping up & filtration of bearing oil 33 Fixing of Gland Seal & Rubber Seal for RTD & DTT Cables on Bottom Bracket 34 Inspection, alignment & Cleaning of Air guide, Air Baffles and Upper and Lower overhang portion of stator winding, Rotor fans & Rotor Poles (24 No.) 35 Repairing, Overhauling & maintenance & inspection of Brush gear cubicle, replacement of carbon brushes, rocker arms and reversing of Polarity DC Supply 36 Dismantling, Overhauling and testing of Generator Upper Guide Bearing (UGB) Oil coolers, cooling pipe line, Gate valves, Flow Indicators etc 37 Dismantling, Overhauling and testing of Generator Lower Guide Bearing (LGB) Oil coolers, cooling pipe line, valves, Flow Indicators etc 38 Dismantling, Overhauling & testing of Generator air coolers (GACs) and cooling lines, 4-Way Valve, and Gate valves 39 Overhauling & testing of Braking & Jacking control system, pipe lines, Brake & Jack cylinders & Brake Pads 40 Painting of 11KV Bus duct and various ancillaries of the Generator 41 Overhauling of H.S. Lubrication System 42 Overhauling of UAT, NGT, SPVT Cubicle, ET, Regulation panel and Instrument panel 43 Overhauling and testing of Special instruments (RTDs, DTTs, Oil level switches, water flow meters, Pressure gauge, Visual flow Indicators, Space heaters etc) 44 Overhauling and testing of Brake Dust collector system, Blower Unit 45 Inspection, testing and cleaning of 11KV Bus duct 46 Assembling/Box up of Machine and allied accessories fitted with 47 Testing and Dry out running of machine 48 Providing and Installation of 100mm motorised valve including gear housing, motor, limit switch, seals, enclosure and mounting base with all amterial, T&P and other consumables as per detailed scope. 49 Modification of existing system for flushing in duplex strainer creating regular chocking problem including cutting, drilling, grinding, machining, machining the surface of strainer bucket and replace with modified system including all consumable T&P and labour. 50 Making a common header for all duplex strainer drain pipe for flushing waste water including all consumable T&P and labour and scope of work. 51 Automation of installed flushing system for flushing of incoming high PPM alongwith debris in cooling water system including installation of local automated panel, cost of all cables, as per the technical specification and scope of work. 52 Overhauling and servicing of Air handling units having DIDW centrifugal fan of capacity 200000 m3/Hr including cleaning, rebalance, align, tighten, greasing of wheel, bent shaft, belts, bearings,mounting belts, demper etc and replacement fo any faulty parts if required all consumable T&P and labour as per the technical specification and scope of work. 53 Overhauling and servicing of Air handling units having DIDW centrifugal fan of capacity 140000 m3/Hr including cleaning, rebalance, align, tighten, greasing of wheel, bent shaft, belts, bearings,mounting belts, demper etc and replacement fo any faulty parts if required all consumable T&P and labour as per the technical specification and scope of work. 54 Overhauling and servicing of Cooling water pumps alongwith cylcone separator including Dismantling, cleaning, lubrication, replacement of all seals, Replacement of bearing, sleeve, neck ring, bushes(if Required), Repairing of impeller (If Required) and assembling including all consumable T&P and labour as per the technical specification and scope of work. 55 overhauling and servicing of Birfucated type tube axialexhaust air fan capacity 10000 m3/Hr including cleaning, alingment, repair and adjust the shaft, bearing, motor etc and replace if required including all consumable T&P and labour as per the technical specification and scope of work. 56 servicing and overhauling of Air cooled packaged ac units having capacity of 16.5 TR make - bluestar including cleaning, checking leaks, repairing, of air filter, thermostat, electrical circuit including transformer, compressor, blower fan, fuse, belt etc and change if required including all consumable T&P and labour as per the technical specification and scope of work. 57 Repairing of fresh air, exhaust air and AC duct including cleaning and checking leakage, reapring of such areas with filling gaps including all consumable T&P and labour as per the technical specification and scope of work. 58 Checking of all electrical connection, Relays, Limit Switch, Rubber Seal of LT Panel of HVAC System and change if required including all consumable T&P and labour.
|